B. F
The
for t
1.
2.
6. At the top of the pod shaft, confirm the Ethernet and power cables are routed
completely through the shaft. Install the cable grommet.
7. Route the cables and pod shaft up through the trolling motor bracket.
8. Use an Allen wrench to install the (2) 10-32 x 9/16" socket bolts on the
bracket where the pod shaft is installed.
9. Tighten the bolts so the pod shaft is completely secure and won’t drop when
it is deployed in the next step.
Hand-tighten only!
10. To finish the installation, proceed to the previous sections
Adjust the Pod
Height
and
Install the Collar Clamp
.
WARNING!
It is important to adjust the pod height and orientation as
shown in the
Adjust the Pod Height
and
Install the Collar Clamp
sections.
Failure to finish the installation and install the pod correctly will result in damage
to the pod.
Hand-Tightening the Socket Bolts
socket bolts
26
AS 360 TM Ultrex
TM_360_Ultrex_IG_532178-2EN_A.qxp_30895_Eng_531478 2/16/17 5:33 PM Page 26