31
4.1.3.1 Edit / Store Data
Follow the steps as outlined in 4.1.3. Now to identify a project Press
F1
and
the following screen will appear.
4.1.3.2 View Stored Data (Examine Previous)
Follow the steps as outlined in 4.1.3, then
F2
PROJECT 0.0000001
STA 000+00
TO 000+00
* INCREASE
* NEXT SCREEN
OFFSET ◊ R 0 0
STA 000+00 LANE E B
* INCREASE
* STORE
PROJECT 0.0000001
STA 000+00
TO 000+00
* INCREASE
* NEXT SCREEN
OFFSET ◊ R 0 0
STA 000+00 LANE E B
* INCREASE
* STORE
DATA COLLECTED
DATE: mm/dd/yy
TIME: hh:mm PM
* NEXT
DD= XXXX.X M = XX.X
WD= XXXX.X %M = XX.X
% PR= XXX.X
* NEXT
MDEPTH = BAC
DC = XXXX.X DS = XXXX.X
MC = XXX.X MS = XXX.X
VR = XXX.X % AV = XXX.X
* NEXT
MDEPTH = BAC