30
www.humancaregroup.com
HeliQ
Detaching the lift from the rail system
Using the lift
Data communication
Remove the pins holding the two bolts to the
rail roller. Hold the lift firmly and remove both
bolts. The lift is now disconnected from the rail
roller.
Place the lift on a flat surface. Press the Up but-
ton on the lift to move the belt back. Make sure
the belt is kept taut and gets rolled up in the lift
straight, without folding.
Important! When the lift is taken
down, the belt must be kept taut
while it is fed into the lift.
Human Care offers several different types of bar
in a variety of widths. The bar chosen should be
appropriate for the client’s needs and the type
of sling used. Place the client in the prescribed
sling according to the sling instructions and hang
the sling in the hooks on the bar. Check that the
sling’s lifting straps are properly anchored in all
hooks.
HeliQ is able to communicate with a standard
PC (Win 7/Win 8). This communication makes it
possible to obtain statistics and other informa-
tion on the lift.
To communicate with the ceiling lift you need
the Human Care Data and Service Application,
software that can be downloaded from the Hu-
man Care website, www.humancaregroup.com.
Connect the lift to your PC with a standard
USB-C cable. Start the Human Care Data and
Service Application and follow the instructions.
The lift must be switched on for communica-
tion to be possible. The lift is deactivated while
communication takes place.
The following information can be read from the
lift.
• Article number, serial number and produc-
tion date
• Max. user weight
• Software version
• Service dates
• Periodic usage statistics
• Error log
Connected computer equipment must fulfil the
requirements of IEC 60950-1 or IEC 60601-1
The latest software for the lift should always
be used. You can find the latest version at our
website in the product section.