
8018653 1.1
Installing BSC hardware • 2-27
6.
Use a 9/16-inch (or metric equivalent) wrench to install safety
ground cable E1 (GND) and 9/16-inch mounting hardware onto
PDU grounding stud E1 (see figure 2-19 for locations).
CHASSIS 1
CIRCUIT B
CHASSIS 2
CHASSIS 3
CHASSIS 1
CIRCUIT A
CHASSIS 2
CHASSIS 3
GROUNDING
STUD E1
GROUNDING
STUD E2
GROUNDING
STUD E3
GROUNDING
STUD E4
GROUNDING STUD
HARDWARE
SAFETY GROUND
CABLE
TERMINAL LUG
9006945-0002
(FROM INSTALLATION KIT)
Figure 2-19. Grounding the BSC rack
7.
Repeat steps 3 and 4 to install the cables listed in table 2-5.
Table 2-5. Input power cable connections
PDU Circuit A
PDU Circuit B
Cable
Destination
Cable
Destination
TB1-1 (-48V)
TB1-1
TB4-1 (-48V)
TB4-1
TB1-2 (RTN)
TB1-2
TB4-2 (RTN)
TB4-2
E1 (GND)
E1
TB5-1 (-48V)
TB5-1
TB2-1 (-48V)
TB1-1
TB5-2 (RTN)
TB5-2
TB2-2 (RTN)
TB1-2
TB6-1 (-48V)
TB6-1
TB3-1 (-48V)
TB1-1
TB6-2 (RTN)
TB6-2
TB3-2 (RTN)
TB1-2
Summary of Contents for GMH2000
Page 2: ...Copyright 1992 1993 1994 Hughes Network Systems Inc ...
Page 6: ...vi Figures 8018653 1 1 ...
Page 8: ...viii Flowcharts 8018653 1 1 ...
Page 10: ...x Tables 8018653 1 1 ...
Page 14: ...xiv About this manual 8018653 1 1 ...
Page 80: ...3 6 Operation and shutdown 8018653 1 1 ...
Page 92: ...4 12 Troubleshooting 8018653 1 1 ...
Page 101: ...8018653 1 1 Maintenance 5 9 ...
Page 105: ...A 4 List of acronyms 8018653 1 1 ...