
2-14 • Installing BSC hardware
8018653 1.1
Y-AXIS
X-AXIS
LEVEL MUST BE USED IN
BOTH AXES: X AND Y
Figure 2-9. Verifying that the BSC rack is plumb
16. If there are no expansion BSC racks to install, continue on to
section 2.5, “Installing BSC input power and ground cables.”
Otherwise, repeat steps 1 through 15 to install the expansion
racks, then go to section “Anchoring multiple BSC racks.”
Summary of Contents for GMH2000
Page 2: ...Copyright 1992 1993 1994 Hughes Network Systems Inc ...
Page 6: ...vi Figures 8018653 1 1 ...
Page 8: ...viii Flowcharts 8018653 1 1 ...
Page 10: ...x Tables 8018653 1 1 ...
Page 14: ...xiv About this manual 8018653 1 1 ...
Page 80: ...3 6 Operation and shutdown 8018653 1 1 ...
Page 92: ...4 12 Troubleshooting 8018653 1 1 ...
Page 101: ...8018653 1 1 Maintenance 5 9 ...
Page 105: ...A 4 List of acronyms 8018653 1 1 ...