![Hughes JVC 100 Service Manual Download Page 23](http://html1.mh-extra.com/html/hughes-jvc/100/100_service-manual_2182203023.webp)
Chapter 2---System Description
Model 100 Service Manual
2-11
Table 2-1
Inputs and Outputs for the LVPS
Inputs
/ LV_ENA
From System Controller/ RTG PCB - enables the LVPS when
the System Controller receives a Power-On command.
/ COVER ON
Indicates the front cover is in place or the Interlock is in the
Service Mode. Enables the non-standby outputs. Also includes
Arc Lamp Thermal Shutdown Sensor signal.
/ FAN_ENA
From System Controller/ RTG PCB - enables the +24 V
Standby voltage for the projector cooling fans.
Outputs
+24V
To cooling fans
+5.1V
+5.1 Stdby for CPU and remote operation.
+6.2V
For CRT Filaments
+15V
For analog circuitry
-15V
For analog circuitry
+60V
For Horizontal power Supply section of Horizontal Deflection
PCB and Video Amplifiers PCB.
/ LV_OK
Feedback signal indicating to the System Controller, the status
of the non-standby supply (working or not working).
NOTE:
a “/”in front of signal name means “active low“. This means the signal
will enable a device such as the LVPS in / LV_ENA. A high = 5V and low = 0V.
The /COVER_ON signal from the cover interlock switch tells the Low Voltage
Power Supply that the front cover is in place and the interlock switch is pressed
in. The /COVER ON signal also includes the Thermal Shutdown signal that
comes from a thermocouple attached to the Arc Lamp. If the Arc Lamp exceeds
130 ± 5
°
C or the Interlock Switch is not pushed in (or pulled out) the Low
Voltage Power Supply shuts down the projector.
Summary of Contents for 100
Page 12: ...Chapter 1 Introduction 1 4 Model 100 Service Manual ...
Page 63: ...Chapter 2 System Description Model 100 Service Manual 2 51 ...
Page 67: ......
Page 115: ...Chapter 5 Troubleshooting Model 100 Service Manual 5 11 Various Problems ...
Page 117: ...Chapter 5 Troubleshooting Model 100 Service Manual 5 13 ...