4
.
2 Installation of base and control box
Before install base subassembly, remove the covered plastic enswathement, put down 4pcs lifting hole
cover board of two sides of bas and 3pcs hand hole cover board.
Lifting the subassembly a little, take off bottom stow-wood, then lifting it to groundwork, fixed on the
groundwork by 8pcs M24 bolts.
After fixed the base and control box, use gradienter to proofread base level, the base level should not
more than 2mm.
Drawing 10 installing the base on the groundwork
j
j
e
e
m
m
y
y
_
_
l
l
e
e
e
e
@
@
h
h
o
o
t
t
m
m
a
a
i
i
l
l
.
.
c
c
o
o
m
m