0HK.412.530SM
LW36A-126/145
High Voltage SF6 AC Circuit Breaker
18/30
2. Put gasket between the regulating lever and operator link when connecting the operator link, to
ensure the operator link’s accept power direction and moving direction are same.
(
see drawing 13
)
.
1 regulating lever 2 operator link
Ⅰ
3 operator link 4
Ⅱ
drive pin 5 adjusting gasket
Drawing
1
3
orientation of operator link
4
.
3
.
4 Connecting of operating mechanism
Connecting the operating mechanism’s output lever with B phase regulating lever. In connecting, prize
the large regulating lever in mechanism through installing hole, make the joint of output lever up and
down jiggle, thereby connect B phase regulating lever by
φ
20 pin easily, see drawing 14. After finished
the connection, fix the drive pin by M6 bolts and template.
1 pole 2 base 3 mechanism 4 operator link 5 B phase regulating lever 6 mechanism’s output lever
Drawing 14 Connecting of operating mechanism
j
j
e
e
m
m
y
y
_
_
l
l
e
e
e
e
@
@
h
h
o
o
t
t
m
m
a
a
i
i
l
l
.
.
c
c
o
o
m
m