SmartACU2000D Smart Array Controller
User Manual (with No PID Module)
4 System Installation
Issue 01 (2020-02-14)
Copyright © Huawei Technologies Co., Ltd.
35
4.4 Installing the Cabinet
Figure 4-2
Marking-off template
4.4.1 Wall-mounted Installation
Step 1
Determine the positions for drilling holes into the wall based on the delivered marking-off
template. For details, see
. Level the marking-off template using a level, and mark
mounting holes using a marker.
Step 2
Drill holes using a hammer drill and install expansion bolts.
Avoid drilling holes into the water pipes and power cables buried in the wall.