
SmartACU2000D Smart Array Controller
User Manual (with No PID Module)
5 Electrical Connections
Issue 01 (2020-02-14)
Copyright © Huawei Technologies Co., Ltd.
59
5.6 Connecting the 4G LTE Cable (Without a PoE SPD)
Step 1
Connect the factory-installed network cable on the SmartLogger to the DATA port on the PoE
module.
Step 2
Connect the factory-installed power cable on the SmartLogger to the PoE module.
Figure 5-14
Connecting cables to the PoE module
Step 3
Connect the network cable delivered with the CPE to the PoE port on the PoE module.
Figure 5-15
Connecting a CPE network cable
----End