RRU5303
Installation Guide
7 Installing the RRU
Issue Draft B (2018-05-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
64
If the RRU is installed on the ground, determine a position for installing the mounting
kits according to the instructions in Figure 7-23.
Figure 7-23
Distance between the mounting kits and the ground
As shown in the figure above, it is recommended that the mounting kits be installed at a position 1200
mm (47.24 in.) to 1600 mm (59.06 in.) high above the ground. If the space is insufficient, only the 3.5
Installation Clearance Requirements of an RRU needs to be provided.
Step 2
Install the RRU mounting kits, as shown in Figure 7-24.
Figure 7-24
Installing the RRU mounting kits
Ensure that the arrows on the pole mounting kits are pointing up.
1.
Adjust the position of the nut and remove the square-neck bolt at the open end from the
slot on the auxiliary bracket.