6 Hoisting an RRU and Related Cables onto a Tower
Issue Draft B (2018-05-15)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
46
Figure 6-11
Wrapping the PVC insulation tape
4.
Installation engineer C pulls the lifting sling downwards, and installation engineer B
pulls the other end of the lifting sling outwards to protect the power cables from
colliding with the tower.
Step 2
Secure the power cables to the tower vertically using cable clips.
Step 3
Remove the cable ties, PVC insulation tape, and lifting sling.
The procedure for hoisting the power cables onto the tower is for your reference only.