1 Changes in the RRU3832&RRU3632 Installation Guide
This chapter describes the changes in the
RRU3832&RRU3632 Installation Guide
.
This chapter describes the reference documents, tools, and instruments that must be ready before
the installation. In addition, it specifies the skills and prerequisites that installation engineers
must have.
3 Information About the Installation
Before installing an RRU, you must be familiar with its exterior, ports, indicators, installation
options and installation clearance requirements.
This chapter describes how to unpack and check the delivered equipment to ensure that all the
materials are included and intact.
The installation process involves installing an RRU and RRU cables, checking the RRU
hardware installation, and powering on the RRU.
6 (Optional) Installing the Plastic Shells of the RRU
This section describes the procedure for installing the plastic shells of the RRU.
7 Hoisting an RRU and Related Cables onto a Tower
This section describes the procedure for hoisting an RRU and related cables onto a tower and
the precautions that must be taken.
This chapter describes the procedure for installing the RRU. The procedure for installing the
RRU varies depending on installation options.
This chapter describes the procedure for installing RRU cables.
10 Checking the RRU Hardware Installation
After an RRU is installed, check the hardware installation.
After all the devices are installed, check the power-on status of an RRU.
This section describes the procedure for adding an easy power receptacle (pressfit type)
connector.
Conventions
Symbol Conventions
RRU3832&RRU3632
Installation Guide
About This Document
Issue 05 (2014-06-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iii