![HTP EL-110 Installation Manual Download Page 48](http://html.mh-extra.com/html/htp/el-110/el-110_installation-manual_2179388048.webp)
48
2. VENTING AS A CHASE
When venting as a chase, follow all instructions
included in Part 5
– Venting, Sections A – G of
this manual, as well as the previous Concentric
Venting section. See Figure 19 for chase venting
demonstration.
NOTES:
A. For every 1” of overhang, the exhaust vent must be
located 1” vertical below overhang (overhang means
top of building structure and not two adjacent walls
[corner of building]).
B. Typical installations require 12” minimum
separation between bottom of exhaust outlet and top
of air intake.
C. Maintain 12” minimum clearance above highest
anticipated snow level or grade (whichever is greater).
D. Minimum 12” between vents when installing
multiple vents.
E. 12” minimum beyond air intake.
F. Maintain 12” minimum clearance above highest
anticipated snow level or grade (whichever is greater).
Figure 19
– Venting as a Chase
Summary of Contents for EL-110
Page 15: ...15 Figure 3 ...
Page 61: ...61 Figure 29 ...
Page 62: ...62 Figure 30 ...
Page 87: ...87 Figure 33 ...
Page 88: ...88 Figure 34 ...
Page 89: ...89 Figure 35 LP 293 A NOTE Parts listed on the following page ...
Page 94: ...94 ...
Page 95: ...95 ...
Page 96: ...96 MAINTENANCE NOTES ...