F
F
L
L
I
I
G
G
H
H
T
T
M
M
A
A
N
N
U
U
A
A
L
L
Document No.:G304MS/AFM
Date of Issue: 07/14
8-1
8.1
Introduction
This Section contains manufacturer's recommended procedures for
proper ground handling and servicing of the powered sailplane. It
also identifies certain inspection and maintenance requirements
which must be followed if the sailplane is to retain that new-plane
performance and dependability. It is wise to follow a planned
schedule of lubrication and preventive maintenance based on
climatic and flying conditions encountered.
8.2
Sailplane inspection periods
Refer to the Operating, Maintenance and Repair Manual, Document
Number G304S/MM for more information on the sailplane periodical
inspections.
8.3
Sailplane alterations or repairs
It is essential that the responsible airworthiness Authority be
contacted prior to any alterations on the sailplane to ensure that the
airworthiness of the sailplane is not compromised.
Refer to the Operating, Maintenance and Repair Manual, Document
Number G304S/MM for more information on the sailplane repairs.
8.4
Powerplant alterations or repairs
It is essential that the user contacts the producer of the powerplant
if repairs to the engine / propeller are requested.