F
F
L
L
I
I
G
G
H
H
T
T
M
M
A
A
N
N
U
U
A
A
L
L
Document No.:G304MS/AFM
Date of Issue: 07/14
4-2
Approved
4.2.2 De-rigging
1. Remove sealing tape from wings and tailplane.
2. Pull front tailplane connection pin out, with the help of the tool,
and lift up tailplane.
3. Unlock and remove connecting pins of the wing extensions and
apply the hand force to take the wing extension out of the
wingtip.
4. Lift wingtips and remove main pin.
5. Gently pull on the wingtips to separate each wing from the
fuselage one at a time.
4.3
Daily inspection
Daily inspection should be performed before each flight day
opening, both after rigging the sailplane and parking in a hangar.
When inspecting the sailplane check for cracks in surface finish,
blisters or uneven surface, and if in doubt, check with authorized,
specialized personnel.
When inspecting the engine check the surface finish and visible
parts for heat damage and the mechanism for extensive plays or
unususal noise during extension/retraction. If in doubt, check with
authorized, specialized personnel.