Figure 28: Securing the switch
3.
Install one #10-32 x 1/2-inch Phillips panhead screw with captive star washer through the front of the
inner rail, through the rear bracket, and secure to the outer rail. Repeat for the other side. See
29: Securing the front of the switch to outer rails
on page 41.
Figure 29: Securing the front of the switch to outer rails
4.
Tighten the screws as mentioned in
5.
Verify that the switch power and status LEDs on the port side of the switch are green. See
on page 42.
Installing and configuring HPE 16Gb FC switches
41