16. Install the air baffle
17. Install the access panel.
18. Install the server into the rack.
19. Connect each power cord to the server.
20. Connect each power cord to the power source.
21. Power up the server.
Removing and replacing an energy pack
Procedure
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
•
Extend the server from the rack.
•
Remove the server from the rack.
5. Do one of the following:
•
• Remove the 4LFF midplane cage (
Removing and replacing a 4LFF midplane cage).
88
Removal and replacement procedures
Summary of Contents for ProLiant DL385 Gen10
Page 30: ...30 Customer self repair...
Page 31: ...Customer self repair 31...
Page 32: ...32 Customer self repair...
Page 129: ...8LFF front panel 12LFF front panel Midplane box LFF only Component identification 129...
Page 142: ...Boxes 2 and 3 to SAS Expander All boxes to SAS Expander 142 Cabling...
Page 143: ...Cable routing Midplane 4LFF SAS SATA drive option Cabling 143...
Page 145: ...Cable routing Rear 3LFF SAS SATA drive option for system board Cabling 145...
Page 147: ...Cable routing Front 2SFF NVMe side by side drive options Cabling 147...
Page 149: ...Cable routing Front 8SFF NVMe drive options Box 1 Box 2 Cabling 149...
Page 150: ...Box 3 150 Cabling...