Cable routing: Chassis intrusion detection switch
Cable routing: M.2 enablement board
This illustration shows the cabling for M.2 enablement board installed in slot 3. The cabling for M.2 enablement board
installed in slot 1 or 2 is similar.
Cable routing: Controller backup power cable
This illustration shows the cabling for type-p controller installed in slot 2. The cabling for type-p controller installed in slot
3 is similar.
Cabling
121
Summary of Contents for ProLiant DL325 Gen10 Plus
Page 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Page 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Page 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Page 52: ...52 Operations...
Page 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Page 119: ...SFF Cable routing Front I O LFF Cabling 119...
Page 120: ...SFF Cable routing Serial port 120 Cabling...