2-13
Library Installation
Step 7: Connect Power
L
ib
r
a
r
y
Ins
ta
lla
tio
n
Step 7: Connect Power
1. Plug the power cord into a proper outlet.
2. Turn on the power switch.
SELF TEST
and
NOT READY
, and then
NOT READY
and
INVENTORY
CHECK
display alternately. After the power-on test completes (in about 3
minutes), the drive status information displays. (See “Understanding the
Display Window” on page 4-4.)
NOTE
If the drive status information does not display, the power-on test was not
successful and
DEVICE FAILED
displays. See “resolving Other Problems”
on page 4-43.
3. Turn on the host system.
Summary of Contents for Surestore Tape Library Model 2/15
Page 4: ...iv ...
Page 8: ...viii Contents ...
Page 10: ...x Figures ...
Page 12: ...xii Tables ...
Page 13: ...1 1 1 Product Description ...
Page 27: ...2 1 2 Library Installation ...
Page 43: ...3 1 3 Tape Cartridges ...
Page 50: ...3 8 Tape Cartridges Labeling Bulk Load Magazines ...
Page 51: ...4 1 4 Library Operation ...
Page 97: ...A 1 A Supplies and Accessories ...
Page 102: ...A 6 Supplies and Accessories Supplies and Accessories ...
Page 103: ...B 1 B Safety and Regulatory Information ...
Page 112: ...B 10 Safety and Regulatory Information Regulatory Information ...