Installing and Configuring the Director
49
Director 2/140 Installation Guide
Inserting the Rear Cage Nuts in the Rack
Use these steps to insert the six (6) supplied cage nuts in the rack’s rear rails.
1. Select one of the exterior vertical rails at the rear of the cabinet. From the
bottom of the shelf bracket, count up 3U (9 holes) and insert the first of three
cage nuts.
2. Count up 4U (12 holes) from the cage nut you just installed, and insert the
next cage nut.
3. Count up 4U (12 holes) from the second cage nut and insert the third cage nut.
4. To install cage nuts in the other rear rail, repeat
step 1
through
step 3
.
Finalizing the Rack-Mounting Procedure
After completing the steps outlined in the previous section, prepare to orient the
Director 2/140 in the rack as described in the following sections. The procedure
requires two technicians.
Caution:
The director weighs approximately 167 lbs. Do not attempt to lift or
carry the director with fewer than two people. Failure to observe this
CAUTION may result in injury to personnel or damage to the director.
Installing the Director in the Rack
Use these steps to maneuver the Director 2/140 into the rack:
1. Using a lift device, position the Director 2/140 at the front of the cabinet.
2. If necessary, adjust the lift height so that the bottom of the Director 2/140 is
parallel with the shelf mounts in the rack.
3. Slide the director along the shelf mounts and into the cabinet until the front
mounting brackets on the Director 2/140 contact the front cabinet rails.
Securing the Front Mounting Brackets to the Rack
Follow this procedure to secure the front mounting brackets attached to the
Director 2/140 to the rack:
1. Secure one of the front mounting brackets to a cabinet rail by attaching
three (3) Phillips panhead screws to the cage nuts you installed earlier.
2. Repeat
step 1
to secure the other front mounting bracket to the remaining
cabinet rail.