Hardware options installation 55
7.
Route the cable along the system board.
8.
Install the battery pack assembly into the server.
9.
Install the PCI riser cage ("
Installing the PCI riser cage
" on page
56
).
10.
Install the front fan bracket ("
Front fan bracket
" on page
53
).
11.
Install the access panel ("
Installing the access panel
" on page
29
).
12.
Power up the server (on page
27
).
Refer to the option documentation for more information.
Redundant hot-plug AC power supply option
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless all bays
are populated with either a component or a blank.
1.
Access the product rear panel (on page
30
).
2.
Remove the power supply blank.
Summary of Contents for ProLiant DL380 Generation 4
Page 98: ...Troubleshooting 98 ...
Page 104: ...Troubleshooting 104 ...
Page 110: ...Regulatory compliance notices 110 Power cord statement for Japan ...