Removal and replacement procedures 81
c.
Finish the installation by completely tightening the screws in the same sequence.
12.
Install all components removed from the failed system board.
13.
Connect all cables disconnected from the failed system board.
14.
Install the fan cage.
15.
Install the air baffle.
16.
Install the PCI riser cages.
17.
Install the access panel.
18.
Do one of the following:
o
Slide the server into the rack.
o
Install the server into the rack.
19.
Connect each power cord to the server.
20.
Connect each power cord to the power source.
21.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes
from amber to green.
IMPORTANT:
Install all components with the same configuration that was used on the failed
system board.
After you replace the system board, you must re-enter the server serial number and the product ID.
1.
During the server startup sequence, press the
F9
key to access UEFI System Utilities.
2.
Select the
System Configuration
>
BIOS/Platform Configuration (RBSU)
>
Advanced Options
>
Advanced System ROM Options
>
Serial Number
, and then press the
Enter
key.
3.
Enter the serial number and press the
Enter
key. The following message appears:
The serial number should only be modified by qualified service personnel.
This value should always match the serial number located on the chassis.
4.
Press the
Enter
key to clear the warning.
5.
Enter the serial number and press the
Enter
key.
Summary of Contents for ProLiant DL180 Gen9
Page 13: ...Customer self repair 13 ...
Page 14: ...Customer self repair 14 ...
Page 15: ...Customer self repair 15 ...
Page 18: ...Illustrated parts catalog 18 ...
Page 23: ...Illustrated parts catalog 23 ...
Page 121: ...Cabling 121 Item Description 3 USB 3 0 connector cable ...