10-31
Planning and Implementation for the 5400zl/8200zl Switches
Configuration Examples
P
lann
ing an
d
Im
pl
em
en
ta
tion f
o
r t
he
5400z
l/
8200z
l Switch
e
s
In this configuration, EPS 2 of the Power Supply Shelf can be connected to
either EPS 1 or EPS 2 of either switch.
Figure 10-22.Connecting the EPS to two switches, one 5412zl and one 8212zl
To Power
Source
To Power Source
To Power
Source
To Power
Source
To Power
Source
EPS Cables
EPS 1
EPS 2
EPS 2
EPS 1
5412zl
8212zl
Summary of Contents for ProCurve 600
Page 1: ...Power over Ethernet HP ProCurve Power over Ethernet PoE PoE Planning and Implementation Guide ...
Page 2: ......
Page 3: ...Power over Ethernet PoE PoE Planning and Implementation Guide ...
Page 42: ......
Page 66: ......
Page 70: ......
Page 80: ......
Page 90: ......
Page 102: ......
Page 120: ......
Page 152: ......
Page 156: ......
Page 166: ......
Page 167: ......