Hardware options installation 88
In addition to the supplied items, you may need:
•
T-10 Torx screwdriver
•
T-15 Torx screwdriver
To convert a tower server to a rack server:
1.
Power down the server (on page
24
).
2.
Disconnect all rear panel cabling ("
Rear panel components
" on page
9
).
3.
Remove the tower bezel ("
Open or remove the tower bezel
" on page
25
).
4.
Remove the feet.
5.
Remove both tower configuration panels:
a.
Using the T-10 Torx screwdriver, remove the front panel screws.
b.
Unhook the tower configuration panels from the chassis.
Summary of Contents for ML350 - ProLiant - G2
Page 89: ...Hardware options installation 89 c Slide them back and away from the chassis ...
Page 112: ...Troubleshooting 112 ...
Page 137: ...Technical support 137 ...
Page 138: ...Technical support 138 ...