12. Align the alignment holes on the processor with the alignment posts on the processor cage,
and carefully lower the processor onto the processor socket. See
Figure 6-31
.
CAUTION:
Do not press the processor into the socket. When properly aligned, the processor
pins seat into the socket. No additional pressure is required. Damage to the pins can occur
if pressure is applied.
13. Lock the processor into the socket on the processor board. See
Figure 6-31
.
a.
Unfasten the processor install tool (2.5 mm driver) from the tool holder on the airflow
guide.
b.
Insert the processor tool into the hole on the side of the heatsink.
c.
Rotate the processor tool clockwise 180 degrees.
CAUTION:
The processor zero insertion force (ZIF) socket is locked and unlocked by
turning the processor tool half of a full turn. The counter-clockwise 180 degree rotation
(half turn) unlocks the socket. A clockwise 180 degree rotation locks the socket.
Attempting to turn the locking mechanism more than 180 degrees can severely damage
the socket.
d.
Fasten the processor install tool (2.5 mm driver) to the tool holder on the airflow guide.
14. Connect the processor power cable into the connector cable that attaches directly to the
processor board. See
Figure 6-30
.
15. Close the processor cage. See
Figure 6-29
.
a.
Grasp the processor cage handle and rotate the cage closure inward toward the rear of
the assembly until it is completely closed.
b.
Apply adequate force to push the handle down until it is flush with the cage.
16. Replace the airflow guide. See
“Replacing the Airflow Guide” (page 148)
.
17. Replace the top cover.
“Replacing the Top Cover” (page 145)
.
18. If rack mounted, slide the server completely into the rack. See
“Inserting the Server into the
Rack” (page 144)
.
19. Reconnect the power cables and power on the server. See
“Powering On and Powering Off
the Server” (page 78)
.
20. Verify processor replacement and operation by using the system utilities.
•
Use the iLO 2 MP
SS
command to verify operation
•
Use the EFI
info cpu
command to verify operation
182
Removing and Replacing Server Components