487
Flag : R/-/- Cost : 10
Next Hop : FE80::20F:E2FF:FE3E:FA3D Interface: Vlan300
Flags: D-Direct, R-Added to Rib, L-Advertised in LSPs, U-Up/Down Bit Set
# Display the IPv6 IS-IS routing table on Switch D.
[SwitchD] display isis route ipv6
Route information for IS-IS(1)
------------------------------
Level-2 IPv6 Forwarding Table
-----------------------------
Destination : 2001:1:: PrefixLen: 64
Flag : R/-/- Cost : 20
Next Hop : FE80::200:FF:FE0F:4 Interface: Vlan300
Destination : 2001:2:: PrefixLen: 64
Flag : R/-/- Cost : 20
Next Hop : FE80::200:FF:FE0F:4 Interface: Vlan300
Destination : 2001:3:: PrefixLen: 64
Flag : D/L/- Cost : 10
Next Hop : Direct Interface: Vlan300
Destination : 2001:4::1 PrefixLen: 128
Flag : D/L/- Cost : 0
Next Hop : Direct Interface: Loop1
Flags: D-Direct, R-Added to Rib, L-Advertised in LSPs, U-Up/Down Bit Set
BFD for IPv6 IS-IS configuration example
Network requirements
As shown in
•
Configure IPv6 IS-IS on Switch A and Switch B so that they can reach other.
•
Enable BFD on VLAN-interface 10 of Switch A and Switch B.
After the link between Switch B and the Layer-2 switch fails, BFD can quickly detect the failure and
notify IPv6 IS-IS of the failure. Then Switch A and Switch B communicate through Switch C.
Summary of Contents for HPE FlexNetwork 7500 series
Page 505: ...493 Connector N A ...