Setup 32
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
35
)."
Installing the server into the rack
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.
1.
Install the server and cable management arm into the rack. For more information, see the installation
instructions that ship with the 2U Quick Deploy Rail System.
2.
Connect peripheral devices to the server.
Item Description
Color
1
PCI slot 5
—
2
PCI slot 6
—
3
PCI slot 4
—
4
PCI slot 2
—
5
PCI slot 3
—
6
PCI slot 1
—
7
Power supply 2
—
8
Power supply 2 connector
—
9
Power supply 1
—
10
Power supply 1 connector
—
11
USB connectors (2)
Black
12 Video
connector
Blue
13
NIC 1 connector
—
14
NIC 2 connector
—
15 Mouse
connector
Green
16 Keyboard
connector
Purple
17 Serial
connector
—
Summary of Contents for HP ProLiant DL385 G6
Page 1: ...HP ProLiant DL385 G6 Server User Guide Part Number 575045 001 April 2009 First Edition ...
Page 6: ...Contents 6 Customer Self Repair 92 Acronyms and abbreviations 100 Index 103 ...
Page 19: ...Component identification 19 For more information see Hot plug fan operation on page 26 ...
Page 52: ...Cabling 52 Cabling SAS hard drive cabling Battery cabling for BBWC ...
Page 73: ...Troubleshooting 73 ...
Page 98: ...Technical support 98 ...
Page 99: ...Technical support 99 ...