The tests available through this command can be displayed as follows:
c>pv -l
Tests Available in Performance Verification;
Test # 1: Powerup PV Results
Test # 2: LAN 10Base2 Feedback Test
Test # 3: LAN 10BaseT Feedback Test
Test # 4: Break In and Trigger Out BNC Feedback Test
Test # 5: Target Probe Feedback Test
Test # 6: Boundary Scan Master Test
c>
The results on a good system are as follows:
c>pv 1
Testing: HPE3499A Series Emulation System
Test # 1: Powerup PV Results passed!
Test # 2: LAN 10Base2 Feedback Test passed!
Test # 3: LAN 10BaseT Feedback Test passed!
Test # 4: Break In and Trigger Out BNC Feedback Test passed!
Test # 5: Target Probe Feedback Test passed!
Test # 6: Boundary Scan Master Test passed!
PASSED Number of tests: 1 Number of failures: 0
Copyright (c) Hewlett-Packard Co. 1987
Copyright (c) International Business Machines Corp. 1995
All Rights Reserved. Reproduction, adaptation, or translation without prior
written permission is prohibited, except as allowed under copyright laws.
HPE3499A Series Emulation System
Version: A.06.00 14Feb96
Location: Generics
HPE3494A PowerPC 603 (rev3) JTAG Emulator
Version: A.01.04 28Feb96
?>
You may get an error like "!ERROR 172! Bad status code (0xff) from the hard
reset sequence" just before the prompt. This is because the selftest loopback
connector is installed instead of being connected to a real PowerPC target
system. You will also get either a "c>" or "?>" prompt for the same reason,
this is normal and expected. Any errors after the "PASSED Number of tests:
1 Number of failures: 0" line can be ignored.
Solving Problems
To execute the built-in performance verification test
88
Summary of Contents for E3494A
Page 3: ...iii ...
Page 4: ...iv ...
Page 8: ...Contents viii ...
Page 9: ...Part 1 Installation Installation 1 ...
Page 10: ...Installation 2 ...
Page 11: ...1 Connecting to the Host Computer Connecting to the Host Computer 3 ...
Page 34: ...Connecting to the Host Computer To verify serial communications 26 ...
Page 35: ...2 Connecting to the Target System Connecting to the Target System 27 ...
Page 39: ...Part 2 Using the HP processor probe Using the HP processor probe 31 ...
Page 40: ...Using the HP processor probe 32 ...
Page 63: ...Part 3 Reference Reference 55 ...
Page 64: ...Reference 56 ...
Page 65: ...4 Designing a Target System Designing a Target System 57 ...
Page 72: ...Designing a Target System PowerPC 603 JTAG Interface Connections and Resistors 64 ...
Page 73: ...5 Specifications and Characteristics Specifications and Characteristics 65 ...
Page 77: ...6 Updating Firmware Updating Firmware 69 ...
Page 83: ...7 Solving Problems Solving Problems 75 ...
Page 102: ...Solving Problems To obtain replacement cables 94 ...