Installation
26
8.
Install all the hot-swappable HDDs assemblies (obpage 19).
9.
Install the access panel (on page 38).
System fans
Cable routing
Removing the system fan assembly
To remove a system fan assembly:
1.
Power down the server and detach all of the power cords from the power supplies.
2.
Remove the access panel (on page 37).
3.
Disconnect the five (5) fan cables from the system board. See page 13 for location.
4.
Remove the fan module.
Summary of Contents for CL2100 G3 407S
Page 64: ...Configuration 64 ...