Hardware options installation 38
6.
Install the Smart Array E200i battery pack on the new cache module provided in the option kit.
7.
Install the new Smart Array E200i cache module.
8.
Install mezzanine card 3, if necessary.
9.
Install the access panel (on page
16
).
10.
Install the server blade ("
Installing a server blade
" on page
19
).
11.
Power up the server blade (on page
14
).