Hardware options installation 36
4.
Remove the mezzanine connector cover. Retain the cover for future use.
5.
Install the mezzanine card. Press down above the connector to seat the board.
6.
Install the access panel (on page
16
).
7.
Install the server blade ("
Installing a server blade
" on page
19
).
8.
Power up the server blade (on page
14
).
HP Smart Array E200i Controller battery pack
option
The optional BBWC enabler provides the system with a means for storing and saving data in the event of
an unexpected system shutdown.