3.13
Connect Ethernet, Ground, and Power Cables
After installing the I/O cable(s), plug the server management Ethernet cable
into the server management HUB. Then install the power cables to the PDU.
Figure 3–16 Ethernet, Ground, and Power Cables
3-26 hp AlphaServer ES47/ES80/GS1280 I/O Drawer Upgrade
Summary of Contents for AlphaServer ES47
Page 4: ......
Page 8: ...viii ...
Page 16: ...1 6 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Page 24: ...2 8 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Page 66: ...4 10 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Page 76: ...5 10 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...