2.4
Shut Down System Power
Perform your regular system maintenance. Back up all important data,
systematically shut down your applications. And perform an orderly
shutdown of the operating system.
Figure 2–1 Turn Off Power
Table 2–3 OCP LED Table
Amber
LED
•
Green
LED
•
Indication
Off Off
No
Vaux
On
Off
Vaux on, bulk power off, attention error inside the box
Off
On
Vaux on, bulk power on, no errors
On
On
Vaux on, bulk power on, attention error inside the box
•
The top LED is amber and the bottom LED is green.
Prepare the System 2-5
Summary of Contents for AlphaServer ES47
Page 4: ......
Page 8: ...viii ...
Page 16: ...1 6 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Page 24: ...2 8 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Page 66: ...4 10 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...
Page 76: ...5 10 hp AlphaServer ES47 ES80 GS1280 I O Drawer Upgrade ...