Verifying Installation
Each time you power on the router during installation, you must verify that:
There is enough space around the router for heat-dissipation and the workbench is
stable enough.
The power supply matches the requirements of the router.
The PGND cable of the router is correctly connected.
The router is correctly connected to the configuration terminal and other devices.
It is very important to verify the installation because the stability and grounding of the router and
the power supply will directly affect the operation of the router.