C-11
To account for the heat dissipation by accessory equipment, lights, people, etc. Fill in Table C-28.
Table C-28. Heat Dissipation (Miscellaneous) Worksheet
Factor
BTUs/Hour (Watts)
System Heat Dissipation
Site Variables
Interface Auxiliary Equipment
Lights
Personnel
Future Expansion
Other Factors
Total Heat Dissipated:
Total heat dissipation in tons of AC
(12,000 BTUs = 1 Ton of AC)
Summary of Contents for 3000/9x9KS Series
Page 10: ...x ...
Page 38: ...A 4 Figure A 1 Space Planning Grid Sheet ...
Page 39: ...A 5 Figure A 2 System Cutouts ...
Page 70: ...B 28 ...
Page 75: ...C 5 Figure C 3 Space Planning Grid ...
Page 76: ...C 6 Figure C 4 K Class Equipment Profiles ...
Page 77: ...C 7 Figure C 5 T Class Equipment Profiles ...
Page 82: ...C 12 ...