2-7
Installing the Switch
Installation Procedures
2. Verify the Switch Passes Self Test
Before mounting the switch in its network location, you should first verify it
is working properly by plugging it into a power source and verifying it passes
its self test.
1.
For the HP 2530 24-port and 48-port switches, connect the power cord
supplied with the switch to the power connector on the back of the switch,
and then into a properly grounded electrical outlet.
For the HP 2530 8-port switches, connect the AC/DC adapter’s power cord
to the power connector on the back of the switch, and then plug the AC/
DC power adapter into a nearby properly grounded electrical outlet.
Figure 2-1. Connecting the power cord
Connect power cord to the
power connector
Connect inline AC/DC power adapter
to the switch and an AC power outlet
HP 2530 24-Port and
48-Port Switches
HP 2530 8-Port Switches
Summary of Contents for 2530-24
Page 2: ......
Page 3: ...HP 2530 Switch Series Installation and Getting Started Guide ...
Page 22: ...1 14 Introducing the Switch Switch Features ...
Page 48: ...2 26 Installing the Switch Sample Network Topologies ...
Page 54: ...3 6 Configuring the Switch Using the IP Address for Remote Switch Management ...
Page 68: ...4 14 Troubleshooting HP Customer Support Services ...
Page 82: ...A 14 Specifications Twisted Pair Cable Connector Pin Outs ...
Page 89: ...B 7 Safety and EMC Regulatory Statements Safety Information China Safety Information China ...
Page 91: ...B 9 Safety and EMC Regulatory Statements EMC Regulatory Statements Korea Taiwan ...
Page 92: ...B 10 Safety and EMC Regulatory Statements EMC Regulatory Statements ...
Page 98: ......