Ambient air independent operation
Approval
VKF-No. Z 14603
CE 0432BPR220556
4
5
6
7
9
8
10
UltraGas
3
2
1
If necessary, insert an
inspection T-piece
Grid to shaft back
ventilation
Combustion air
Example UG K-LAS C80/125 PP
1
Connection assembly kit LAS to UltraGas
®
and
Boiler connection piece E80 ->C80/125 PP, L = 200 mm
2
Inspection T-piece C80/125 PP with measure opening
3
Wall plate to wall duct C80/125; 220 x 220 mm
4
Wall socket D = 150 mm L = 300 mm to wall duct
5
Bearing rail E Flue gas tube support in shaft
6
Support arch C80/125 - 90° PP
7
Set (2 pieces) distant holder E130 of spring steel;
a distant holder must be used at least every 2 metres
8
Top part E130 for chimney end for back ventilation
with shaft cover
9
Rain keep-off rail D=125 grey
10
LAS-mouth piece C80/125 PP Flue gas tube
of high grade steel white coated
Assembly kit
UG K-LAS C80/125 PP
0
2
4
6
8
10
12
14
16
18
20
22
24
0
1
2
3
4
5
6
UltraGas
®
(35)
UltraGas
®
(15)
UltraGas
®
(20)
UltraGas
®
(27)
Maximum horizontal length connecting pipe (m)
Maximum ef
fective height flue gas pipe (m)
18
4 217 213 / 01
ASSEMBLY
Summary of Contents for UltraGas 15
Page 48: ...48 4 217 213 01...
Page 49: ...49 4 217 213 01...