
5
6
7
8
10
UltraGas
3, 4
2
1
9
If necessary, insert an
inspection T-piece
Combustion
air
Min. 1m
Example UG AW C100/150 PP
1
Connection assembly kit LAS to UltraGas
®
(35,50)
and boiler connection piece E80 -> C80/ 125 PP, L= 200
2
Adapter piece C80/125 -> C100/150
3
Inspection T-piece with measure opening C100/ 150 PP
4
Concentric wall duct with wall plate 220 x 220 mm C100/150
white coated (RAL 9016)
5
Outside wall distant holder Ø 150 mm
incl. mounting material, high grade steel
6
Arch T-piece C100/150
7
Outside wall distant holder Ø 150 mm stainless steel
8
Lead pan with bowl C100/150 for roof execution
(gradient 25-55° adjustable), ground plate 500 x 500 mm
9
Rain keep-off rail, steel anthracite
10
LAS-mouth piece C100/ 150 PP
Flue gas tube of high grade steel white coated
Assembly kit
UG AW C80/125 PP
0
2
4
6
8
10
12
0
1
2
3
4
5
6
UltraGas
®
(35)
UltraGas
®
(15)
UltraGas
®
(20)
UltraGas
®
(27)
Maximum horizontal length connecting pipe (m)
Maximum ef
fective height flue gas pipe (m)
Assembly kit
UG AW C100/150 PP
0
2
4
6
8
10
12
14
16
0
1
2
3
4
5
6
Anbindeleitung [m]
Höhe [m]
UltraGas
®
(35)
UltraGas
®
(50)
UltraGas
®
(70)
Maximum horizontal length connecting pipe (m)
Maximum ef
fective height flue gas pipe (m)
19
4 217 213 / 01
ASSEMBLY
Summary of Contents for UltraGas 15
Page 48: ...48 4 217 213 01...
Page 49: ...49 4 217 213 01...