14
I. Final Checklist
WARNING
CHOKING HAZARD:
Ensure all components,
fasteners, and thumbscrews are securely in place
after installation. Make sure that none have fallen into
the storage bin.
1) Is the icemaker level?
2) Is the icemaker in a site where the ambient temperature
is within 45°F to 100°F (7°C to 38°C) and the water
temperature within 45°F to 90°F (7°C to 32°C) all year
around?
3) Is there at least 6" (15 cm) clearance at sides, rear, and
top of the icemaker for proper air circulation and ease of
maintenance and service?
4) Have the shipping carton, tape, and packing material
been removed from the icemaker? Are the cube
guides in their correct positions? See Fig. 19. Are the
separators between the evaporator banks properly
attached to their holding clips?
5) Are all components, fasteners, and thumbscrews
securely in place?
6) Have all electrical and water connections been made?
Do electrical and water connections meet all national,
state, and local code and regulation requirements?
7) Has the power supply voltage been checked or tested
against the nameplate rating? Has a proper ground
(earth) been installed to the icemaker? On remote
air-cooled model, has a proper ground (earth) also
been installed to the remote condenser unit?
8) Are the water supply line shut-off valves and drain
valves installed? Has the water supply pressure been
checked to ensure a minimum of 10 PSIG (0.7 bar) and
a maximum of 113 PSIG (7.8 bar)?
Note: The icemaker may stop running when the water
supply is off, or if the pressure is below 10 PSIG
(0.7 bar). When the proper water pressure is
reached, the icemaker automatically starts
running again.
9) Are the compressor hold-down bolts snug? Have the
refrigerant lines been checked to make sure they do
not rub or touch other lines or surfaces? Have the fan
blade(s) (if applicable) been checked to make sure they
turn freely?
10) On remote air-cooled model, is the refrigerant line set
tightened and free of leaks and kinks?
11) On remote air-cooled model, has the icemaker power
supply been on for a minimum of 4 hours?
12) Has the end user been given the instruction manual,
and instructed on how to operate the icemaker and the
importance of the recommended periodic maintenance?
Upon completion of startup, this installation manual
should also be given to the end user.
13) Has the end user been given the name and telephone
number of an authorized service agent?
14) Has the warranty card been filled out and forwarded to
the factory for warranty registration?
Fig. 19
Cube Guides
Separators
Summary of Contents for KM-1301S J-E Series
Page 35: ...35 Intentionally Left Blank ...