![horsch Maestro 24 SW Operating Instructions Manual Download Page 84](http://html1.mh-extra.com/html/horsch/maestro-24-sw/maestro-24-sw_operating-instructions-manual_2164100084.webp)
Downpipe
After the grain transfer in the metering unit
the grain drops through the downpipe into the
ground.
The sensor is the basis for monitoring the drilling
process. The sensor detects each grain and
reports it to the computers.
These evaluate the data and times between
grain signals and use this information to calcu-
late the variation coefficient (drilling accuracy),
faults and double seeds.
Downpipe and sensor must therefore be cor-
rectly installed and fastened.
NOTE
Because of its shape, the downpipe is extremely
important for a uniform placement of grains.
a
Standard downpipe
(a) Catching hook
Installing the downpipe
The catching hook on the downpipe fastens the
downpipe on the drill unit.
Catching hook engaged
¾
Guide the downpipe down at the front edge
of the recess in the drill unit.
¾
Plug in the top locking bolt and secure it with
a cotter pin.
¾
Attach the seal to the pipe inlet. Ensure tight
fitting.
Seal and locking bolt
If correctly assembled, the downpipe sits tightly
in the opening. It does not touch the trap roller.
¾
Check the correct installation on the drill unit
from underneath.
approx. 2-4 cm
c
b
Downpipe correctly installed
(b) Downpipe
(c) Trap roller
0 cm
c
b
Downpipe incorrectly installed
80
81
Summary of Contents for Maestro 24 SW
Page 2: ......
Page 5: ......
Page 37: ...16460 700 9470 4060 3180 3000 9470 700 4060 33...
Page 108: ...Wheel hub support wheel 2x Lift arm 2x Support wheel mounting 2x 104...
Page 114: ......