background image

42

UDACT-2  — Instruction Manual

 P/N 54089:B3 10/29/2019

Panel-Specific Information

NCA-2 (UL 864 10th), NCA (UL 8th)

Below is an internal installation of a UDACT-2 with an NCA:

Below is a remote installationof a UDACT-2 with an NCA-2 using power supplied by the control panel:

To Phone Lines 
(supervised)

Connect to 
Chassis

ud

ac

t2

-nc

a

-s

a

m

e

cab

a.

wm

f

NCA

Figure A.9  UDACT-2 and NCA in the Same Cabinet

ud

ac

t2

-nc

a

-s

a

m

e

cab

a.

wm

f

To Supervised 

Phone Lines

Solid Earth Ground

CAB-3/4 Series Cabinet

TB7: EIA-485 

(ACS Mode)

TB6: +24 VDC 

non-resettable power

Wires in 

conduit

ud

ac

t2

-n

ca

2

-s

e

prt

 c

a

bs

a

.w

m

f

Remote Cabinet

NCA

Figure A.10  UDACT-2 and NCA-2 in Separate Cabinets

Summary of Contents for NOTIFIER UDACT-2

Page 1: ...Universal Digital Alarm Communicator Transmitter UDACT 2 Document 54089 Rev B3 10 29 2019 ECN 18 305 ...

Page 2: ... provide adequate warning of a fire Smoke detectors cannot be expected to provide adequate warning of fires caused by arson children playing with matches especially in bedrooms smoking in bed and violent explosions caused by escaping gas improper storage of flammable materials etc Heat detectors do not sense particles of combustion and alarm only when heat on their sensors increases at a predeterm...

Page 3: ...ove all electronic assemblies prior to any drilling filing reaming or punching of the enclosure When possible make all cable entries from the sides or rear Before making modifications verify that they will not interfere with battery transformer or printed circuit board location Do not tighten screw terminals more than 9 in lbs Over tighten ing may damage threads resulting in reduced terminal conta...

Page 4: ...priate version for a specific application Documentation Feedback Your feedback helps us keep our documentation up to date and accurate If you have any comments or suggestions about our online Help or printed manuals you can email us Please include the following information Product name and version number if applicable Printed manual or online Help Topic Title for online Help Page number for printe...

Page 5: ...y Driver Auxiliary Output Connections TB4 20 2 7 USB Port J6 22 2 8 UL Power limited Wiring Requirements 22 Section 3 Programming 23 3 1 General Settings 1 23 3 2 General Settings 2 24 3 3 Primary Number Event Codes 25 3 4 Secondary Number Event Codes 26 3 5 Zone and Point Assignments 26 3 6 Report 27 Section 4 Operation 28 4 1 Switches 28 4 1 1 SW1 Option Select Switch 28 4 1 2 SW 2 Trans Clear B...

Page 6: ...ng 37 A 3 3 Wiring 37 A 4 NCA 2 UL 864 10th NCA UL 8th 40 A 4 1 General 40 A 4 2 Mounting 40 A 4 3 Wiring 40 A 5 AM2020 AFP1010 UL 8th 43 A 5 1 General 43 A 5 2 Mounting 43 A 5 3 Wiring 43 A 6 NFS2 3030 UL 864 10th NFS 3030 UL 8th 45 A 6 1 General 45 A 6 2 Mounting 45 A 6 3 Wiring 45 ...

Page 7: ...ed Documentation AM2020 AFP1010 NFS 640 AFP 300 400 NCA AFP 200 NFS 3030 This product incorporates field programmable software In order for the product to comply with the requirements in the Standard for Control Units and Accessories for Fire Alarm Systems UL 864 certain programming features or options must be limited to specific values or not used at all as indicated below Program Feature or Opti...

Page 8: ...t function Manual master transmission clear function Compact in size 6 75 x 4 25 Mounts in the panel box or in a separate enclosure Communicates vital system status including Independent zone point alarm trouble and supervisory Security panel off normal NAC trouble AC main power loss programmable report delay LED status indicators for power EIA 485 loss primary and secondary line seizure line fail...

Page 9: ... vices equipment or procedures which may affect the operation of this control panel However the telephone company is required to give advance notice of such changes or interruptions If the control panel causes harm to the telephone network the telephone company reserves the right to temporarily discontinue service Advance notification will be provided except in cases when advance notice is not pra...

Page 10: ... system if present are connected together This precaution may be particularly important in rural areas The Load Number LN assigned to each terminal device denotes the percentage of the total load to be connected to a telephone loop which is used by the device to prevent overloading The termination on a loop may consist of any combination of devices subject only to the requirement that the total of...

Page 11: ...ATION ACTIVE Illuminates during USB communication 15 LINE SEIZE SEC Red LINE SEIZE SECONDARY Illuminates when the secondary phone line is seized 16 LINE FAIL SEC Yellow LINE FAILURE SECONDARY Illuminates when the secondary phone line voltage test fails 17 NO TONE SEC Yellow NO TONE SECONDARY Illuminates when the secondary phone connection does not receive a handshake tone from the Central Station ...

Page 12: ...switch down for over 3 seconds to have the UDACT 2 transmit a test message to both Central Stations The message reported is the same as the automatic test message for all formats except Ademco Contact ID 4 RESET Press this button switch down for a hardware reset Switch Switch Name Description Table 1 4 Switches 2 of 2 ...

Page 13: ...Internal or Remote AM2020 AFP1010 CAB 3 4 Series ABS 8RB UBS 1B UBS 1R Internal or Remote NCA 2 CAB 3 4 Series ABS 8RB UBS 1B UBS 1R Internal or Remote NCA CAB 3 4 Series ABS 8RB UBS 1B UBS 1R Internal or Remote NFS2 640 CAB 3 4 Series ABS 8RB UBS 1 UBS 1B UBS 1R Internal or Remote NFS 320 NFS 320 Cabinet ABS 8RB UBS 1 UBS 1B UBS 1R Internal or Remote NFS 320SYS CAB 3 4 Series ABS 8RB UBS 1B UBS 1...

Page 14: ... 2 can be mounted in the fourth column of the NFS2 640 Chassis Be sure to mount the chassis to the backbox before mounting the UDACT 2 Step Action 1 Disconnect AC power and disconnect batteries 2 Insert the tab at the bottom of the board into the chassis slot as indicated 3 Position the UDACT 2 on the standoffs and fasten with 4 screws UDACT 2_CHS2 M2 wmf NFS2 640 Chassis 4 40 screws standoff loca...

Page 15: ...ion 1 Disconnect AC power and disconnect batteries 2 Insert the tab at the bottom of the board into the chassis slot as indicated 3 Position the UDACT 2 on the standoffs and fasten with 4 screws NOTE The UDACT 2 can be mounted in one of the rear positions of this chassis Step Action 1 Disconnect AC power and disconnect batteries 2 Position the UDACT 2 on the standoffs and fasten with 4 screws Figu...

Page 16: ...2 3030 Mounting to the right of an NFS2 3030 Step Action 1 Disconnect AC power and disconnect batteries 2 Position the UDACT 2 on the standoffs and fasten with 4 screws Step Action 1 Disconnect AC power and disconnect batteries 2 Position the UDACT 2 on the standoffs and fasten with four 4 screws Step Action 1 Disconnect AC power and disconnect batteries 2 Insert the tab at the bottom of the board...

Page 17: ...d in conduit Step Action 1 Disconnect AC power and disconnect batteries 2 Mount the BMP 1 onto a DP DISP DP DISP 2 or ADP 4B dress panel by placing it over the two threaded studs and fastening with two 4 40 KEPS hex nuts included with BMP 1 as indicated 3 Attach four 3 16 hex standoffs p n 42170 included with UDACT 2 to the BMP 1 s four threaded studs 4 Align the UDACT 2 over the standoffs and fas...

Page 18: ...over the four 4 threaded standoffs at the back of the ABS 8RB enclosure 3 Secure using the four 4 screws supplied with the enclosure Tighten securely 4 After completion of connections and programming secure cover to ABS 8RB box with two 2 screws Tighten securely Step Action 1 Align the UDACT 2 over the four 4 threaded standoffs at the back of the UBS 1B R enclosure 2 Secure using the four 4 screws...

Page 19: ...jacent to or in the same conduit as 120 volts AC service noisy electrical circuits that are powering mechanical bells or horns audio circuits above 25 volts RMS motor control circuits or SCR power circuits 2 4 TB2 Earth Connection An earth ground connection to the UDACT is required for transient protection TB2 provides a connection to ground for lightning protection 2 5 Telephone Connections J3 an...

Page 20: ...ry Central Stations total communication failure entry into program type and trouble shoot modes Wiring from the UDACT 2 terminal TB4 to the relay must be in the same room no more than 20 feet in length and enclosed in conduit Wiring from the relay output contacts must remain in the same room as the UDACT 2 When the UDACT 2 is programmed for Receive Only typically this occurs when annunciators are ...

Page 21: ...1 C MR 201 C UDACT 2 SLC from FACP Continuation of SLC FMM 1 47K EOL Resistor included Udact 2 monitr wmf MR 201 C may be used If the SLC device does not match the one in this figure refer to the SLC manual appendix which contains wiring conversion charts for type V and type H modules Figure 2 17 Monitoring for UDACT 2 Trouble NOTE An FMM 1 Monitor Module is used to supervise the Normally Open out...

Page 22: ...in the cabinet All power limited circuit wiring must remain at least 0 25 6 35 mm away from any nonpower limited circuit wiring Furthermore all power limited circuit wiring and nonpower lim ited circuit wiring must enter and exit the cabinet through different knockouts and or conduits Figure 2 19 Typical Wiring for UL Power limited Requirements UDACT 2 J6 USB Type B connection Figure 2 18 USB Port...

Page 23: ...Point Reporting Receive Transmit Select when the UDACT 2 will receive messages from the panel and will transmit a response back to the panel Typically this selection is made when UDACT 2 does not share an EIA 485 address with another device The AFP 200 panel does not accommodate Point Reporting AC Loss Reporting Delay Select the time delay for AC Loss Reporting Values are 1 2 6 7 8 9 10 11 15 16 1...

Page 24: ...odule L1M1 L1M100 L2M1 L2M100 addresses per loop Addresses higher than 100 are supported by the system but will not report 3 2 General Settings 2 Primary Primary Format Select SIA 4 2 standard or Ademco Contact ID Primary Phone Number Enter the primary phone number The phone number may be preceded by one or more command codes See the description of the Additional Phone Commands field below Primary...

Page 25: ...e primary or secondary phone number Select whether to have the device address appear in Central Station reporting or not by selecting Enable or Disable Ademco Contact ID These optional fields appear if Ademco Contact ID has been selected as the format for either the primary or second ary phone number Entries in these fields will appear in the reporting at the Central Station Group enter a value of...

Page 26: ...wo digits Ademco Contact ID accomodates three Copy Primary When the primary and secondary reporting formats are the same this button will activate Press to copy the Setting val ues entered at the Primary Number Event Codes tab Default Press to return the Setting fields to default values 3 5 Zone and Point Assignments Zone and point assignments are displayed at this screen The function default is t...

Page 27: ...rs 1 64 report as device numbers 321 384 Loop 2 Detectors 1 64 report as device numbers 385 448 Loop 1 Detectors 65 128 report as device numbers 449 512 Loop 2 Detectors 65 128 report as device numbers 513 576 Loop 1 Detectors 129 159 report as device numbers 577 607 608 is not used Loop 2 Detectors 129 159 report as device numbers 609 639 640 is not used 3 6 Report A printed report with point or ...

Page 28: ...mediately stop UDACT 2 transmissions hang up from the telephone net work clear out any messages that were waiting for transmission and reset and return to normal system processing 4 1 3 SW 3 Test Report Button Press and hold this button switch down for over 3 seconds to have the UDACT 2 transmit a test message to both Central Stations The message reported is the same as the automatic test message ...

Page 29: ...xxxx 11 Zone point alarm code xxxx 00 General Supervisory xxxx 81 Zone point supervisory code xxxx 00 General Fault xxxx F1 AC Fault xxxx F6 Zone point fault code xxxx 00 Low Battery fault xxxx F8 Telco Primary Line Fault xxxx FA Telco Secondary Line Fault xxxx FB NAC Fault xxxx FC Communication Trouble Primary xxxx FD Communication Trouble Secondary xxxx FE 485 Communication Trouble xxxx FE Syste...

Page 30: ...rvisory 200 General Fault 300 AC Fault 301 Zone point Fault 380 Low Battery 302 Telco Primary Line Fault 351 Telco Secondary Line Fault 352 NAC Fault 321 Communication Trouble Primary 354 Communication Trouble Secondary 354 485 Communication Trouble 300 System Off Normal 308 Reserved 000 System 24 Hour Test 602 System 24 Hour Test with Active Event 608 Manual Test 601 Security Alarm 130 Future Use...

Page 31: ... Event Code General alarm code FA System 24 hour test w active event RY Zone point alarm code FA Manual test RX General supervisory FS Security alarm restore BH Zone point supervisory FS Zone point defined as fire alarm FA General fault FT Disable zone point report 00 AC fault AT Zone point defined as supervisory FS Zone point fault FT Zone point defined as pull station FA Low battery fault YT Zon...

Page 32: ...ry restore BH NAC fault restore YH Zone point defined as 24 hour non burglary restore UH Comm trouble primary number restore YK Zone point defined as high temperature restore KH Comm trouble secondary number restore YK Zone point defined as low temperature restore ZH 485 Comm trouble restore YK Zone point defined as low water pressure restore SR System off normal restore FR low water level restore...

Page 33: ...9500 3 Silent Knight 9800 4 FBI CP220FB 5 Osborne Hoffman 2000E 6 Radionics 6600 7 SurGard MLR2 8 SurGard System III 9 SurGard MLR 2000 10 Table 6 1 Compatible UL Listed Receivers NOTE 1 With 685 8 Line Card with Rev 4 4d software 2 With 124060V206B and 124063 Line Card Rev B 3 With version V2 4 Receiver and 126047 Line Card Rev G 4 With 124077V2 00 Receiver and 126047 Line Card Rev M 5 With softw...

Page 34: ... A 1 Connect the communication line between the EIA 485 terminal block TB5 on the AFP 200 and TB2 terminals EIA 485 and EIA 485 on the UDACT 2 being certain to observe polarity If the UDACT 2 is the only or last device connected to the EIA 485 set SW1 DIP 1 4 to ON to enable the UDACT 2 s 120 ohm termi nating resistor Connect the Ground Wire PN 71073 provided from the UDACT 2 earth terminal on TB2...

Page 35: ...ters of the panel Wiring must be enclosed in conduit If the AFP 300 or AFP 400 is contained in a CAB 3 4 Series cabinet then the UDACT 2 may be mounted to another chassis within that cabinet A 2 3 Wiring Connections Refer to Figures A 2 and A 3 Connect the communication line between the EIA 485 terminal block TB4 on the AFP 300 AFP 400 and TB2 terminals EIA 485 and EIA 485 on the UDACT 2 being cer...

Page 36: ...onduit is required for external wire runs Consult local building codes 3 Refer to Specifications on page 8 for power requirements Below is a remote installation of a UDACT 2 with an AFP 300 AFP 400 NOTE The shield end that is not connected should be insulated to prevent accidental grounding Do not connect both ends of shield under any circumstance since a ground fault may result To Phone Lines sup...

Page 37: ...ed in conduit This is the recommended installation for use with the NFS2 640 If the UDACT 2 is mounted within the cabinet that contains an NFS 640 then it may be mounted to another chassis within the CAB 3 4 backbox within the cabinet that contains an NFS 320 then it must be mounted to the NFS 320 chassis and programmed before installing the KDM2 R2 keypad within the cabinet that contains the NFS2...

Page 38: ...uilding earth ground Connect 24VDC filtered non resettable power from the CPU2 640 TB7 to TB1 24V and 24V terminals on the UDACT 2 Notes 1 Recommended wire is 12 AWG 3 25mm2 to 18 AWG 0 75mm2 twisted pair shielded cable Connect only one end of shield a shield may be connected to cabinet earth ground at fire alarm panel or b shield may be connected to TB1 Terminal 5 Shield at UDACT 2 as shown in Fi...

Page 39: ...low is a remote installation of a UDACT 2 with an NFS 640 To Phone Lines supervised Solid Earth Ground Connection udact2 2640320 samecaba wmf NFS2 640 NFS 320 NFS 320SYS Figure A 5 UDACT 2 and NFS2 640 NFS 320 NFS 320SYS in the Same Cabinet To Phone Lines supervised Solid Earth Ground Connection NFS 640 in Separate Cabinet udact2 640 seprtcabsa wmf UDACT 2 Wires in conduit Figure A 6 UDACT 2 and N...

Page 40: ...t be enclosed in conduit If the NCA or NCA 2 is contained in a CAB 4 Series cabinet then the UDACT 2 may be mounted to a CHS 4 CHS 4MB chassis assembly within that cabinet A 4 3 Wiring Connections Refer to Figures A 8 through A 11 Connect the communication line between the EIA 485 terminal block TB3 on the NCA or TB7 on the NCA 2 and TB2 on the UDACT 2 being certain to observe polarity If the UDAC...

Page 41: ...t UDACT 2 as shown in Figure A 8 2 Conduit is required for external wire runs Consult local building codes 3 Refer to Specifications on page 8 for power requirements Below is a remote installation of a UDACT 2 with an NCA NOTE The shield end that is not connected should be insulated to prevent accidental grounding Do not connect both ends of shield under any circumstance since a ground fault may r...

Page 42: ... 2 using power supplied by the control panel To Phone Lines supervised Connect to Chassis udact2 nca samecaba wmf NCA Figure A 9 UDACT 2 and NCA in the Same Cabinet udact2 nca samecaba wmf To Supervised Phone Lines Solid Earth Ground CAB 3 4 Series Cabinet TB7 EIA 485 ACS Mode TB6 24 VDC non resettable power Wires in conduit udact2 nca2 seprt cabsa wmf Remote Cabinet NCA Figure A 10 UDACT 2 and NC...

Page 43: ...ng must be enclosed in conduit A 5 3 Wiring Connections Refer to Figures A 12 and A 13 Connect the communication line between the EIA 485 terminal block on the AM2020 AFP1010 and EIA 485 and EIA 485 terminals on TB2 on the UDACT 2 being certain to observe polarity If the UDACT 2 is the only or last device connected to the EIA 485 set SW1 DIP 1 4 to ON to enable the UDACT 2 s 120 ohm termi nating r...

Page 44: ...ACT 2 as shown in Figure A 12 2 Conduit is required for external wire runs Consult local building codes 3 Refer to Specifications on page 8 for power requirements Below is a remote installation of a UDACT 2 with an AM2020 AFP1010 using an MPS 24A main power supply NOTE The shield end that is not connected should be insulated to prevent accidental grounding Do not connect both ends of shield under ...

Page 45: ...in 20 feet 6 1 meters of the panel Wiring must be enclosed in conduit For mounting instructions see Remote Installation on page 17 or Internal Installation on page 13 A 6 3 Wiring Connections Refer to Figures A 14 through A 16 Connect the communication line between the EIA 485 terminal block on the CPU2 3030 CPU 3030 and EIA 485 and EIA 485 termi nals on the UDACT 2 being certain to observe polari...

Page 46: ...s Consult local building codes 3 Refer to Specifications on page 8 for power requirements Below is a remote installation of a UDACT 2 with an NFS 3030 using power supplied by the control panel NOTE The shield end that is not connected should be insulated to prevent accidental grounding Do not connect both ends of shield under any circumstance since a ground fault may result udact2 3030_a wmf CAB 3...

Page 47: ...upply CAB 3 4 Series Cabinet Wires in conduit To supervised phone lines Solid earth ground EIA 485 ACS Mode TB7 on control panel 24 VDC non resettable power TB6 on control panel Remote Cabinet udact2 23030_a wmf Figure A 15 UDACT 2 and NFS2 3030 udact2 nca2 amps24a wmf CAB 3 4 Series Cabinet To supervised phone lines Solid earth ground EIA 485 ACS Mode TB7 on FACP 24 VDC non resettable power TB3 A...

Page 48: ...e recognition 8 Document sources 7 Double line seizure 19 E earth ground 9 19 EIA 485 9 19 34 35 37 40 43 45 ACS circuit only one UDACT 2 8 F FBI receiver 33 FCC Registration Number 9 Features 8 G ground fault 36 38 41 44 46 Ground Wire 34 35 38 40 43 45 H host panel 8 20 I IC Registration Number 10 installation internal 13 remote 13 Installation options internal or remote 13 Insulating barrier 18...

Page 49: ...6 SIA Programming 24 Reporting Format 31 SurGard receiver 33 T Telephone company 9 connections 19 jacks 19 line voltage 20 lines 19 network 9 Test Time Interval 24 25 trouble conditions 20 T Tapped 19 twisted pair 34 36 38 41 44 46 U UBS 1B 18 UBS 1R 18 UDACT 2 only one on EIA 485 8 19 23 UDACTM point reporting 24 USB 10 port VeriFire Tools 8 V VeriFire Tools version 23 voice 43 voltage telephone ...

Page 50: ...50 UDACT 2 Instruction Manual P N 54089 B3 10 29 2019 Index ...

Page 51: ...MPLIED WITH RESPECT TO THE PRODUCTS TRADEMARKS PROGRAMS AND SERVICES RENDERED BY MANUFACTURER INCLUDING WITHOUT LIMITATION INFRINGEMENT TITLE MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE MANUFACTURER SHALL NOT BE LIABLE FOR ANY PERSONAL INJURY OR DEATH WHICH MAY ARISE IN THE COURSE OF OR AS A RESULT OF PERSONAL COMMERCIAL OR INDUSTRIAL USES OF ITS PRODUCTS This document constitutes the on...

Page 52: ...NOTIFIER 12 Clintonville Road Northford CT 06472 1610 USA 203 484 7161 www notifier com ...

Reviews: