30
Installing the ACUIX ES
Figure 2-3
Video Selection Switch SW1 and Wiring P1, P2, and P3 Locations
ON = UTP Video Enabled
OFF = COAX Video Enabled
SW1 Video Selection
The base of the pendant, surface
mount or in- ceiling housing and scan
assembly has these switches and
plugs. Shown is the pendant or
surface mount. See
example of the in-ceiling.
Contact Wiring Plugs P2 and P3
Power and Data Wiring Plug P1
P1
P2
P3
BNC Connector
Summary of Contents for ACUIX ES
Page 1: ...Document 800 01949 Rev D 05 09 Installation and Configuration Guide ACUIX ES PTZ Analog Dome ...
Page 10: ...10 ...
Page 12: ...12 ...
Page 26: ...26 Introduction to the ACUIX ES PTZ Dome ...
Page 46: ...46 Installing the ACUIX ES ...
Page 70: ...70 Configuring the ACUIX ES ...