Section 4: Maintenance
20
Owner’s Manual for 60 Hz Air-cooled Generators
4.
Clean the plug(s) by scraping or washing with a
wire brush and commercial solvent. Do not blast
the plug(s) to clean.
5.
Check the spark plug gap using a wire feeler
gauge. See
bending the ground electrode to the specification in
Section 2
.
Figure 4-3. Spark Plug Gap Adjustment
Valve Lash Adjustment
Check the valve clearance after the first 25 hours of
operation, then after 400 hour intervals. Adjust if
necessary.
Important:
Please contact an Independent Authorized
Service Dealer for service assistance. This is a very
important step to ensure longest life for the engine.
Figure 4-4. Valve Clearance Adjustment
Check Valve Clearance
•
The engine should be cool before checking.
Adjustment is not needed if valve clearance is
within the specification in Section 2
.
•
Remove spark plug wires and position wires away
from plugs.
•
Remove spark plugs.
•
Make sure the piston is at top dead center (TDC) of
its compression stroke (both valves closed). To get
the piston at TDC, remove the intake screen at the
front of the engine to gain access to the flywheel
nut. Use a large socket and socket wrench to
rotate the nut and hence the engine in a clockwise
direction. While watching the piston through the
spark plug hole. The piston should move up and
down. The piston is at TDC when it is at its highest
point of travel.
Adjust Valve Clearance
See
•
The engine should be cool before adjustment.
•
Remove spark plug wires and position wires away
from plugs.
•
Remove spark plugs.
•
Remove the four screws attaching the valve cover.
Remove and discard gasket.
•
Loosen the rocker jam nut (A) using a 10mm Allen
or 13mm Allen wrench.
•
Turn the pivot ball stud (B) while checking
clearance between the rocker arm (C) and the
valve stem (D) with a feeler gauge. Correct
clearance is in the specification in Section 2
.
NOTE:
Hold the rocker arm jam nut in place as the pivot
ball stud is turned.
•
When valve clearance is correct, hold the pivot ball
stud in place with the Allen wrench and tighten the
rocker arm jam nut. Tighten the jam nut to 174
in-
lbs
(19.68 Nm) torque. After tightening the jam nut,
recheck valve clearance to make sure it did not
change.
•
Install new valve cover gasket.
•
Install the valve cover. Tighten fasteners in a cross
pattern, torquing to 48
in-lbs
(5.4 Nm).
NOTE:
Start all four screws before tightening or it will
not be possible to get all the screws in place. Make sure
the valve cover gasket is in place.
•
Install spark plugs.
•
Re-attach the spark plug wire to the spark plug.
•
Repeat the process for the other cylinder, if
necessary.
Battery Maintenance
The battery should be regularly inspected per the
:
1.
With the generator shut down, lift the lid and
remove the front panel.
000211
000602
A
B
C
D
Summary of Contents for 11 kW
Page 31: ......
Page 63: ......
Page 68: ...Table des matières 2 Manuel du propriétaire pour les générateurs refroidis à l air de 60 Hz ...
Page 95: ......