Homa Sanistar 1 Series Installation And Operation Instruction Manual Download Page 18

18 

 

 

Inhoudsopgave 

 

Inhoud Pagina 

  1.    Conformiteitverklaring 

19 

  2.    Veiligheidsvoorschriften 

20 

  2.1.    Algemeen 

20 

  2.2.    Algemene veiligheidsvoorschriften 

20 

  3.    Inzetbaarheid en technische 
         beschrijving 

20 

  3.1.    Toepassing van de installatie 

20 

  3.2.    Technische beschrijving 

20 

  3.3.    Technische gegevens 

21 

  3.4.    Bedrijfsvoorwaarden 

21 

  3.5.    Omgeving met explosiegevaar 

21 

  4.    Garantie 

21 

  5.    Transport en opslag 

21 

  6.    Elektrische aansluiting 

21 

  6.1.    Algemeen 

6.2. Elektronische 

schakelkasten 

6.2.1 

Sanistar Enkelpomp installatie             

6.2.2 

Sanistar Dubbelpomp installatie 

6.3     Fase verwisseling            

21 
22 
22 
23 
23 

 

  7.      Montage en Installatie 

24 

  8.      In bedrijf stellen 

24 

  9.      Onderhoud en Service 

24 

10.      Storingen – Oorzaken/Oplossingen 

25 

11.      HOMA Klantenservice 

25 

12.      Garantiebepalingen en 
           garantiebewijs 

26 

13.      Installatievoorbeelden 

27 

14.      Afmetingen 

15.      Onderdelenlijsten en tekeningen           

27 

29 

15.1.    Ondedelenlijsten reservoir 

29 

15.2.    Onderdelentekeningen reservoir 

29 

15.3.    Onderdelenlijsten pompen 

32 

15.4.    Onderdelentekeningen pompen 

32 

16.      Bestellformulier voor onderdelen 

34 

 
 
 
 

1

. Conformiteitsverklaring

 

 
EG-Conformiteitsverklaring Volgens de EG-
Machinerichtlijn 89/392/EWG, bijlage II A 
 
Wij, HOMA Pumpenfabrik GmbH, Industriestrasse 1, 
D-53819 Neunkirchen-Seelscheid, verklaren hiermee dat 
de opvoerinstallatie 
 

Sanistar 

 
op grond van hun concipi

ё

ring en bouwwijze als ook in de 

door ons in verkeer gebrachte uitvoering aan de 
desbetreffende fundamentele veiligheids- en 
gezondheidseisen van de EG-machinerichtlijnen voldoen. 
Bij een niet met ons afgestemde verandering aan de 
pompen, verliest deze verklaring haar geldigheid. 
EG-Richtlijnen, waaraan de pompen voldoen: 
EG-Machinerichtlijn 89/392/EWG 
Als ook de wijziging 

91/368/EWG  

Als ook de wijziging 

93/  44/EWG  

Als ook de wijziging 

93/  68/EWG  

EG-Richtlijn elektromagneti-
sche verdraagzaamheid 

    89/336/EG 

als ook de aanpassing 

    92/  31/EG 

als ook de aanpassing 

    93/  68/EG 

EG-laagspanningsrichtlijn  

    73/  23/EG 

EG-Richtlijn explosievrije 
bedrijfsmiddelen

2)

 

79/196/EWG  

Als ook de aanpassing 

84/  47/EWG 

 88/571/EWG 

 

 
Toegepaste geharmoniseerde normen: 
EN 60335-2-41

1)

 EN 

60335-1

1)

 

EN 60034 deel 5 

EN 60204 deel 1

1)

  EN 50081-1 

EN 50082-1 

EN 55014 

EN 55104 

EN 60555-2 

EN 60555-3 

EN 292 

EN 50014/18/19/20

2)

 

 
 
Bijzondere toegepaste nationale normen en techni-
sche specificaties ( de overige toegepaste normen 
voor de algemene machinebouw worden in het 
constructiebureau bewaard): 
 
ISO 9906 

DIN 24250 

 
 
 
 
 
 
 
 
(Dr. Klaus Hoffmann Management) 
01.09.2003 

HOMA Pumpenfabrik GmbH 

 
 

1)

 niet geldig voor Ex-uitvoering 

2)

 geldt alleen voor Ex-uitvoering 

 
 

 
 
 
 

 

Summary of Contents for Sanistar 1 Series

Page 1: ...e und Bedienungsanleitung Installation and Operation Instruction Manual Montage en Bedrijfsinstructies Abwasser Hebeanlage Compact sewage disposal unit Afvalwater opvoerinstallatie Baureihe Series San...

Page 2: ...e 18 Pagina 18 Seite 20 Page 20 Pagina 20 DEUTSCH ENGLISH NEDERLANDS Installationsbeispiele Installations Installatievoorbeelden Bauma e Dimensions Afmetingen Ersatzteilliste und Ersatzteilzeichnungen...

Page 3: ...owie in der von uns in Verkehr gebrachten Ausf hrung den einschl gigen grundlegenden Sicherheits und Gesundheitsanforderun gen der EG Maschinenrichtlinien entsprechen Bei einer nicht mit uns abgestimm...

Page 4: ...r Ger t verur sacht werden wenn die Hinweise und Vorschriften aus dieser Bedienungsanleitung nicht eingehalten werden nicht haften F r Zubeh rteile gelten die gleichen Be stimmungen 3 Einsatz und Tech...

Page 5: ...sschlie lich explosionsgesch tzte Ausf hrungen eingesetzt werden Die Explosionsschutzklasse der Pumpen muss in je dem Einzelfall von den Beh rden f r den Montageort zu gelassen werden 4 Garantie Garan...

Page 6: ...oranlauf erzeugt dies einen Ruck des Motors entgegen dem Uhrzeigersinn Zur Vertauschung der Phasen bei falscher Phasenfolge siehe unter Punkt 6 3 Gr ne LED Betrieb Leuchtet wenn die Pumpe arbeitet Rot...

Page 7: ...r eine der gr nen Betriebs LED rufen Sie bitte unseren Kundendienst HOMA ServCom Contoller zum Programmieren und Abrufen von Betriebsdaten als Zubeh r erh ltlich 6 3 Phasenvertauschung Bei 1Ph Motoren...

Page 8: ...isierten Fachwerkstatt durchgef hrt wurden oder wenn bei einem Teileaustausch keine ORIGINAL ERSATZTEILE verwendet wurden nicht haften F r Zu beh rteile gelten die gleichen Bestimmungen Vor jeder Arbe...

Page 9: ...atzbedingungen mangelnde Pflege oder unsach gem e Reparaturversuche zur ckzuf hren sind sind von der Garantie ebenso ausgeschlossen wie normaler Verschlei Hier durch entstandene Kosten insbesondere be...

Page 10: ...ttrum 0 42 64 12 50 Ritz GmbH Carl Zeiss Str 33 79761 Waldshut Tiengen 0 77 41 48 80 Pumpen Binek Kirchsteig 2 31275 Lehrte 0 51 36 89 30 37 Wolfgang B rk Forststr 17 79618 Rheinfelden 0 76 23 75 21 0...

Page 11: ...pect to their design and construction the following pump types in the form in which they are marketed by us conform to the relevant fundamental safety and health requirements of the EC Machine Directi...

Page 12: ...accessories 3 Applications and Technical Description 3 1 Applications HOMA disposal units Sanistar are used for pumping waste water effluent or groundwater containing sludge or soft solids from rooms...

Page 13: ...nd stored in vertical or horizontal position Make sure that it cannot roll or fall o ver For longer periods of storage the unit should be pro tected against moisture frost or heat 6 Electrical Connect...

Page 14: ...e LED Failure the pump was stopped by thermal cutout In this case push the Reset switch If the pump still does not work please contact your HOMA service Red LED Failure Flash Signal The Failure LED fl...

Page 15: ...in the discharge pipe the pipe and the liftimg station should be dimensioned for a water velocity of minimum 0 7 m s for vertical pipes however not lower than 1 0 m s The incoming sewer could be ensu...

Page 16: ...y is watertight and that the cables are not bent sharply and or pinched Pump parts Check for possible wear Replace defective parts Ball bearings Check the shaft for noisy or heavy opera tion turn the...

Page 17: ...eated by a streng tech nical end control before delivery If the unit still gives an occasion for a legitimated complain you have the claim of an appropriated correction free of charge Warranty repairs...

Page 18: ...mpenfabrik GmbH Industriestrasse 1 D 53819 Neunkirchen Seelscheid verklaren hiermee dat de opvoerinstallatie Sanistar op grond van hun concipi ring en bouwwijze als ook in de door ons in verkeer gebra...

Page 19: ...en Wij wijzen erop dat wij volgens de product aanspra kelijkheidswet niet aansprakelijk zijn voor schade welke door onze machines veroorzaakt worden wanneer de aanwijzingen en voorschriften uit deze g...

Page 20: ...gevaar Gebruik in explosiegevaarlijke omgevingen alleen de explosie vrije uitvoeringen In alle gevallen dient de plaatselijke instantie te bepalen of de explosieclassificatie van de pomp voor de gewen...

Page 21: ...fasen bij verkeerde fasevolgorde zie punt 6 3 Groene LED Betrieb Brand wanneer de pomp in werking is Rode LED St rung Continu signaal in verbinding met LED Alarm Branden st rung en alarm LED beiden c...

Page 22: ...e aanbevolen jaarlijkse onderhoudstermijn is bereikt Het signaal wordt door de servicedienst na onderhoud gereset Onderhoudssignaal deactiveren De bedrijfsschakelaar in stand Aus Off zetten en aanslu...

Page 23: ...naar de buitenlucht te worden geleid Bevestig de meegeleverde aangesloten pomp besturing in overeenstemming met de in Nederland Belgi geldende richtlijnen tegen de wand De kabel tussen motor en bestu...

Page 24: ...lokkeerd Aanvoer afsluiten Reservoir met handpomp leegpompen Reinigingsopening openschroeven en het reservoir met de hand legen en eventuele vaste delen in het medium verwijderen Drukslang van de nive...

Page 25: ...trenge technische eindcontrole Mocht het apparaat desondanks reden tot een gerechtvaardige garantieclaim geven dan heeft u recht op een aansprekende kostenloze afwerking Garantiereparaties mogen allee...

Page 26: ...ect connection Euro WC inlet height 180 mm Direkt aansluiting Euro WC toeloophoogte 180 mm Direktanschluss H nge WC Zulaufh he 250 mm Direct connection hanging WC inlet height 250 mm Direkt aansluitin...

Page 27: ...Verticale inlaat DN 100 DN 40 6 Anschlu f r pneumatische Steuerung Connection for pneumatic control box Aansluiting pneumatische besturingskast 7 Entl ftungsstutzen DN 70 Air vent DN 70 Ontluchting DN...

Page 28: ...cription Pos Part description 1 01 Collecting tank 4 06 PVC hose 1 02 Countersunk hexag socket screw 5 01 Rubber fabric hose 1 03 Washer 5 02 Hose band 1 04 Fastener 6 01 Flanged spigot 3 01 Valve hou...

Page 29: ...27 xx Knickschutzt lle 360 Lagerdeckel 834 xx Kabeldurchf hrung 410 Dichtklappe 835 xx Motoren Klemmbrett 411 xx Dichtring 836 xx Klemmleiste 412 xx O Ring 837 Betriebskondensator 420 Wellendichtring...

Page 30: ...the motor cooling jacket 932 xx Circlip 704 Threaded tube for the motor cooling jacket 940 Fitting key 719 Shrink down plastic tubing 950 Ball bearing disc 720 90 discharge elbow 970 Pump label 721 ST...

Page 31: ...31 15 4 Ersatzteilzeichnung Pumpe Spare part drawing pump Onderdelenlijst Pomp Sanistar 110 W D Sanistar 210 W D Sanistar 120 W D Sanistar 130 D Sanistar 220 W D Sanistar 230 D...

Page 32: ...Nr Bezeichnung Menge Lieferanschrift Unterschrift Firmenstempel 16 Order Sheet for Spare Parts To HOMA Pumpenfabrik GmbH D 53819 Neunkirchen Seelscheid Fax 49 22 47 7 02 44 Pump type see pump label Y...

Page 33: ...1 183 622212 Fax 31 183 620193 Pomp type zie typeplaatje Bouwjaar zie typeplaatje Gedetailleerde onderdelen 1 Pos nr Omschrijving Aantal 2 Pos nr Omschrijving Aantal 3 Pos nr Omschrijving Aantal 4 Pos...

Page 34: ...___________ ______________________________ ______________________________ ______________________________ ______________________________ ______________________________ ______________________________ __...

Page 35: ...35...

Page 36: ...36...

Reviews: