18
ill.1
ill.2
ill. 3
ill. 4
ill. 5
Placing the Lateral Supports:
If you have not already done so: Attach 2 Lateral Support #2.0 (full length of greenhouses) on
both sides using the Hexagon Bolts. Place in each of the Curved Profiles. One lays on top of the
Front and Back Wall Crossbars (#1.4) the other goes at head height - but below the Roof
Window.
If you have bought the specially designed optional RIGA shelving system the upper support can
be placed whereever you wish to place the upper shelf.
Assembling Top Shelving (Optional Accessory)
Step 1:
Place Eye-Ring Hook combination in each Curved Profile (near the top) on
the side of the greenhouse where you want to place the shelving. (See Illustration 1-
inset in picture above)
Step 2:
For the top shelf: Slide as many Hexagon Bolts into the channel at the bottom of the
Lateral Supports (against the wall of the greenhouse) as you have Curved Profiles (i.e. RIGA III
has 4 Curved Profiles on each side). Attach to each bolt the longer flat end (1.25“) of the Cross
Struts (about 16“ long) and secure with nuts.
Next: Bend the cross-struts to a horizontal position (Ill. 2)
Then: Slide into the bottom and side channels of another Lateral Support (similar to the one
already fixed into the wall of the greenhouse) as many bolts as you have cross-struts - in the
same locations as the one with the Cross-struts. Now attach the Cross-struts to the bolts on the
bottom of the second Lateral Support. Next hang the necessary chains from each of the Eye-
Hooks that you earlier put in the Curved Profiles. Raise the top shelf and put the bolts through the
rings on each of the chains and secure with white knobs. Make sure the shelf hangs horizontal.
You can also adjust the position of the Eye-Hooks to make each chain hang perfectly vertical.
See picture above for details. Last: Insert the removable polycarbonate shelves.