Hohner ORION 4 Operating Instructions/Spare Parts List Download Page 9

Hohner Maschinenbau GmbH – ORION 4 

- 9 -

 

6. 

Installation of the chlincher box 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Slide both clincher box mounting studs  

1  

in the T-slot of the clincher box receiver  

2  

 
Install  the  clincher  box   

3   

on  with  the  mounting  studs   

1   

and  make  certain  that  the 

adjustment screw  

4  

is aligned with the driving slot as shown. Tighten both clamp nuts  

6.  

Be sure the clincher box is correctly aligned with the stitching head.  

 

Summary of Contents for ORION 4

Page 1: ...Operating Instructions Spare parts list ORION 4 05 2008 Pad and Folder Wire Stitching Machine Hohner Maschinenbau GmbH G ns cker 19 78532 Tuttlingen Telephone 07462 9468 0 Fax 07462 9468 20...

Page 2: ...Hohner Maschinenbau GmbH ORION 4...

Page 3: ...n of the stitching table 7 5 Installation of the narrow stitching heads 70 20 8 6 Installation of the chlincher box 9 7 Basic adjustment of clinchers 10 8 Pressure adjustment for clincher back pressur...

Page 4: ...0 6 Before sample stitching and production remove all tools from the stitching head and from the machine 7 Residual risks if there is no stitching material beneath the stitching head there is a risk t...

Page 5: ...stitching and in a saddle position for brochure stitching Positioning occurs via stops The machine has a three phase motor 1 10 kW 230 400 volt 50 Hz 3 phases with clutch brake combination Tripping oc...

Page 6: ...Hohner Maschinenbau GmbH ORION 4 6 3 Measures plan of the ORION 4...

Page 7: ...dles 5 upwards and tighten them Installation of the stitching table for brochure stitching With the lever 1 lift all stitching heads to the highest position Slide the stitching table 2 with the small...

Page 8: ...illed part must point downwards Install the stitching head with the boring over the peg of the key blocks 1 at the same time also align the driving block 3 the pusher 4 and adjusting block 5 with the...

Page 9: ...nting studs 1 in the T slot of the clincher box receiver 2 Install the clincher box 3 on with the mounting studs 1 and make certain that the adjustment screw 4 is aligned with the driving slot as show...

Page 10: ...pressure of the clincher spine pressure must be adjusted at minimal pressure correspond to 2 sheet stitching See page 8 Adjustement Loosen the allen set screw 1 Cycle the machine by hand see page 10 u...

Page 11: ...g thickness and the kind of paper First loosen clamp levers 1 on the right and left side of the machine then loosen the clamp lever 2 and adjust the clincher back pressure with the adjusting lever 3 A...

Page 12: ...of the machine Measure the book thickness in milimeters Move adjusting lever 2 to the proper thickness indicated on the scale 3 Tighten the hexagon head screws 1 Be sure they are extremely tight If t...

Page 13: ...this step use the pipe spanner 19 mm 2 Attention Before all repairs disconnect the power supply and set safety switch main switch to 0 First remove the plug 1 Put the double offset ring wrench 2 on th...

Page 14: ...1 screw driver SB 7 0 Art No 46 00 008 1 hexagon socket screw key SW 3 Art No 46 00 014 1 diagonal cutting nipper Art No 46 00 019 1 hexagon socket screw key SW 5 Art No 46 00 038 1 double offset rin...

Page 15: ...Hohner Maschinenbau GmbH ORION 4 15 12 Flow diagrams Orion 4 Nr 43 44 360 P 1 3 400 V 3 Phase AC Y 50 60 Hz Orion 4 Nr 43 44 362 P 1 3 230 V 3 Phase AC 50 60 Hz...

Page 16: ...3 44 360 Orion IV Maschine Machine Machine Zeichnungs Nr Drawing Nr Dessin No 1 2 3 4 5 6 7 8 9 29 03 05 VEK L1 Q1 L1 T1 L2 T2 L3 T3 X1 1 Q2 1 2 3 4 5 6 X1 5 M1 U V W PE L2 2 6 L3 3 7 N N 4 PE PE PE X...

Page 17: ...destination Br cken bridge pont Klemmennummer binder number numero borne Anschlu supply reccordement Zielpunkt destination destination Bezeichnung description d signation Bezeichnung description d si...

Page 18: ...0003 4300004 4300237 4300237 Sch tz Motor L fter Motor Hauptschalter Motorschutzschalter Fu schalter Endschalter Sicherheitsschalter Kupplungs Brems Kombination Funkenl schglied Funkenl schglied conta...

Page 19: ...mination 43 44 362 Orion IV 21 05 08 VEK Maschine Machine Machine Zeichnungs Nr Drawing Nr Dessin No Index 1 2 3 4 5 6 7 8 9 L1 Q1 L1 T1 L2 T2 L3 T3 X1 1 Q2 1 2 3 4 5 6 X1 5 M1 U V W PE L2 2 6 L3 3 7...

Page 20: ...orne Anschlu supply reccordement Zielpunkt destination destination Bezeichnung description d signation Bezeichnung description d signation Seite Pfad page path bord sentier ORION4 230V W1 ORION4 230V...

Page 21: ...0003 4300004 4300237 4300237 Sch tz Motor L fter Motor Hauptschalter Motorschutzschalter Fu schalter Endschalter Sicherheitsschalter Kupplungs Brems Kombination Funkenl schglied Funkenl schglied conta...

Reviews: