Hohner ORION 4 Operating Instructions/Spare Parts List Download Page 17

2

C Hohner Maschinenbau GmbH

Änderung

Name

S

e

ite

S

he

e

t

P

a

g

e

Klemmleiste

Bennenung / Title / Dénomination

43 44 360

Orion IV

21.05.08 VEK

Maschine / Machine / Machine

Zeichnungs-Nr. / Drawing-Nr. / Dessin-No.

Index

2

 

3

 

4

 

6

 

7

 

8

 

9

 

Klemmleiste / connector block / borne plate

K

a

b

e

lb

e

ze

ic

h

n

un

g

c

ab

le

 m

ar

ke

r

re

p

ér

e

K

a

b

e

lb

e

ze

ic

h

n

un

g

c

ab

le

 m

ar

ke

r

re

p

ér

e

A

ns

ch

lu

ß

su

p

p

ly

re

cc

o

rd

e

m

e

nt

Z

ie

lp

un

kt

d

e

st

in

a

tio

n

d

e

st

in

a

tio

n

B

ck

e

n

b

ri

d

g

e

p

o

nt

K

le

m

m

e

nn

um

m

e

r

b

in

d

e

nu

m

b

e

r

nu

m

e

ro

 b

o

rn

e

A

ns

ch

lu

ß

su

p

p

ly

re

cc

o

rd

e

m

e

nt

Z

ie

lp

un

kt

d

e

st

in

a

tio

n

d

e

st

in

a

tio

n

B

e

ze

ic

h

n

un

g

d

e

sc

ri

p

tio

n

d

é

si

g

n

at

io

n

B

e

ze

ic

h

n

un

g

d

e

sc

ri

p

tio

n

d

é

si

g

n

at

io

n

Seite/Pfad

page/path

bord/sentier

=400V-X1

T1

/1.1

-Q1

1

1

-Q2

T2

/1.2

-Q1

2

3

-Q2

T3

/1.2

-Q1

3

5

-Q2

/1.2

-N

4

A2

-K1

2

/1.1

-Q2

5

U

-M1

4

/1.2

-Q2

6

V

-M1

6

/1.2

-Q2

7

W

-M1

/1.6

8

-M2

A2

/1.7

-K1

9

-G1

/1.3

10

12

-S3

/1.3

11

11

-S3

1

/1.6

-K1

12

-M2

/1.7

13

-G1

/1.4

14

23

-S1

A1

/1.4

-K1

15

24

-S1

A1

/1.5

-K1

16

22

-S2

2

/1.5

-K1

17

21

-S2

3

/1.8

-K1

18

-G1

4

/1.8

-K1

19

A1

-K

22

/1.9

-K1

20

A1

-B

/1.2

-PE

PE

PE

-M1

Summary of Contents for ORION 4

Page 1: ...Operating Instructions Spare parts list ORION 4 05 2008 Pad and Folder Wire Stitching Machine Hohner Maschinenbau GmbH G ns cker 19 78532 Tuttlingen Telephone 07462 9468 0 Fax 07462 9468 20...

Page 2: ...Hohner Maschinenbau GmbH ORION 4...

Page 3: ...n of the stitching table 7 5 Installation of the narrow stitching heads 70 20 8 6 Installation of the chlincher box 9 7 Basic adjustment of clinchers 10 8 Pressure adjustment for clincher back pressur...

Page 4: ...0 6 Before sample stitching and production remove all tools from the stitching head and from the machine 7 Residual risks if there is no stitching material beneath the stitching head there is a risk t...

Page 5: ...stitching and in a saddle position for brochure stitching Positioning occurs via stops The machine has a three phase motor 1 10 kW 230 400 volt 50 Hz 3 phases with clutch brake combination Tripping oc...

Page 6: ...Hohner Maschinenbau GmbH ORION 4 6 3 Measures plan of the ORION 4...

Page 7: ...dles 5 upwards and tighten them Installation of the stitching table for brochure stitching With the lever 1 lift all stitching heads to the highest position Slide the stitching table 2 with the small...

Page 8: ...illed part must point downwards Install the stitching head with the boring over the peg of the key blocks 1 at the same time also align the driving block 3 the pusher 4 and adjusting block 5 with the...

Page 9: ...nting studs 1 in the T slot of the clincher box receiver 2 Install the clincher box 3 on with the mounting studs 1 and make certain that the adjustment screw 4 is aligned with the driving slot as show...

Page 10: ...pressure of the clincher spine pressure must be adjusted at minimal pressure correspond to 2 sheet stitching See page 8 Adjustement Loosen the allen set screw 1 Cycle the machine by hand see page 10 u...

Page 11: ...g thickness and the kind of paper First loosen clamp levers 1 on the right and left side of the machine then loosen the clamp lever 2 and adjust the clincher back pressure with the adjusting lever 3 A...

Page 12: ...of the machine Measure the book thickness in milimeters Move adjusting lever 2 to the proper thickness indicated on the scale 3 Tighten the hexagon head screws 1 Be sure they are extremely tight If t...

Page 13: ...this step use the pipe spanner 19 mm 2 Attention Before all repairs disconnect the power supply and set safety switch main switch to 0 First remove the plug 1 Put the double offset ring wrench 2 on th...

Page 14: ...1 screw driver SB 7 0 Art No 46 00 008 1 hexagon socket screw key SW 3 Art No 46 00 014 1 diagonal cutting nipper Art No 46 00 019 1 hexagon socket screw key SW 5 Art No 46 00 038 1 double offset rin...

Page 15: ...Hohner Maschinenbau GmbH ORION 4 15 12 Flow diagrams Orion 4 Nr 43 44 360 P 1 3 400 V 3 Phase AC Y 50 60 Hz Orion 4 Nr 43 44 362 P 1 3 230 V 3 Phase AC 50 60 Hz...

Page 16: ...3 44 360 Orion IV Maschine Machine Machine Zeichnungs Nr Drawing Nr Dessin No 1 2 3 4 5 6 7 8 9 29 03 05 VEK L1 Q1 L1 T1 L2 T2 L3 T3 X1 1 Q2 1 2 3 4 5 6 X1 5 M1 U V W PE L2 2 6 L3 3 7 N N 4 PE PE PE X...

Page 17: ...destination Br cken bridge pont Klemmennummer binder number numero borne Anschlu supply reccordement Zielpunkt destination destination Bezeichnung description d signation Bezeichnung description d si...

Page 18: ...0003 4300004 4300237 4300237 Sch tz Motor L fter Motor Hauptschalter Motorschutzschalter Fu schalter Endschalter Sicherheitsschalter Kupplungs Brems Kombination Funkenl schglied Funkenl schglied conta...

Page 19: ...mination 43 44 362 Orion IV 21 05 08 VEK Maschine Machine Machine Zeichnungs Nr Drawing Nr Dessin No Index 1 2 3 4 5 6 7 8 9 L1 Q1 L1 T1 L2 T2 L3 T3 X1 1 Q2 1 2 3 4 5 6 X1 5 M1 U V W PE L2 2 6 L3 3 7...

Page 20: ...orne Anschlu supply reccordement Zielpunkt destination destination Bezeichnung description d signation Bezeichnung description d signation Seite Pfad page path bord sentier ORION4 230V W1 ORION4 230V...

Page 21: ...0003 4300004 4300237 4300237 Sch tz Motor L fter Motor Hauptschalter Motorschutzschalter Fu schalter Endschalter Sicherheitsschalter Kupplungs Brems Kombination Funkenl schglied Funkenl schglied conta...

Reviews: