127
Section 5 - Scheduled Maintenance
Carbide Ring
Packing
Stuffing Box, Glandnut, Packing & Plunger
Plunger
Guide Bushing or Carbide Ring
9. Check the plunger for scoring and wear. Polish
or replace if necessary.
10. Reinstall the guide bushing in the gland nut
and apply anti-seize to the gland nut threads.
11. Insert the plunger fully into the gland nut. Be
careful to not dislodge the guide bushing.
12. Install new packing onto the plunger. Push it
tight against the guide bushing.
13. Carefully install the plunger, packing and gland
nut assembly into the stuffing box
14. Hand tighten the gland nut. Then insert the
Jetstream Tool into the gland nut and hit the
tool three times with the hammer in a clock-
wise direction to tighten.
Summary of Contents for STRIPE SH7500
Page 1: ...75 H Operations Manual...
Page 2: ......
Page 72: ...72 NOTES...
Page 108: ...108 NOTES...
Page 161: ...161 Section 5 Scheduled Maintenance...
Page 167: ...167 Appendix 2 Tools Spare Parts...
Page 168: ...168 Appendix 2 Tools Spare Parts...
Page 169: ...169 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 60...
Page 178: ...178 NOTES...
Page 185: ......
Page 186: ......