54
54
Stripe Hog Systems
You can avoid overflow of material in the debris
bag by monitoring the water level and dumping
the recovered water when ¾ full or when you have
downtime. The debris bag should be checked at
the beginning of the shift as part of the pre-start
procedure or when you believe it may be reaching
its capacity. It should also be checked at the end
of each shift. Debris should never be left inside the
debris tank for a period of more than two days.
Debris will harden and conform to the shape of
the tank walls making it very difficult to dump.
Once dumping operations are complete it is criti-
cal that the door seal and it’s point of contact be
cleaned to maintain a water tight seal during op-
erations. The O-ring seal and point of contact on
the primary vacuum tube on top of the debris tank
must also be cleaned before the tank is lowered
to the full down position. Also make sure all drain
valves are closed before resuming waterblasting
operations.
Always comply with local guidelines and state law
when dumping recovered water and debris.
Vacuum Tube Coupler O-ring & Point OF Contact At the Top of the Debris Tank
WARNING
IF A DEBRIS BAG IS uSED AND NOT INSTALLED CORRECTLY
IT MAY NOT RELEASE PROPERLY DuRING DuMPING THIS
COuLD CAuSE THE LINER TO SEPARATE FROM THE DEBRIS
TANK, DAMAGING THE TANK AND/OR CAuSING PERSONAL
INJuRY.
WARNING
ALWAYS MAKE SuRE THAT ALL PERSONNEL ARE WELL
CLEAR OF THE TRuCK AND THE DEBRIS TANK DOOR WHEN
DuMPING OPERATIONS ARE IN PROCESS. NEvER ROCK
OR JERK THE TRuCK BACK AND FORTH TO DISLODGE
MATERIAL STuCK IN THE DEBRIS TANK. THIS CAN CAuSE
THE HYDRAuLIC RAM AND/OR OTHER COMPONENTS
TO FAIL WHICH COuLD RESuLT IN SEvERE INJuRY TO
PERSONNEL AND SEvERE DAMAGE TO THE uNIT.
Summary of Contents for Stripe Hog SH8000
Page 1: ...Operations Manual...
Page 2: ...2...
Page 6: ...6 NOTES...
Page 16: ...16 NOTES...
Page 80: ...80 NOTES...
Page 166: ...166 NOTES...
Page 171: ...171 Troubleshooting UHP POWER FRAME...
Page 172: ...172 Troubleshooting...
Page 173: ...173 Appendix 2 Tools Spare Parts...
Page 174: ...174 Tools Spare Parts...
Page 175: ...175 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Page 176: ...176 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 61...
Page 179: ...179 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 64...
Page 180: ...180 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 65...
Page 181: ...181 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 66...
Page 184: ...184 NOTES...
Page 191: ......